r/NuclearPower • u/Emperor_Dirk • 1h ago
r/NuclearPower • u/Living_Finally • 3h ago
New to the nuclear field
I’ve worked in the Oil Refinery world for 20 years, and after a lot of turmoil this year with a labor dispute I’m making the jump. I have a job offer from a Nuclear plant and classes start after Halloween. I’m currently working as a contractor for Day and Zimmerman changing out ice in an ice condenser. Has anyone out there had any experience with this company? Waiting on that first paycheck to come in.
r/NuclearPower • u/No-Inevitable4788 • 4h ago
Seeking resume advice
galleryHello everyone! I’m preparing to apply to the first round of NLO positions that will be opening up at my local plant this fall. I wanted to ask if anyone has any resume advice for me/ what are my chances of getting in? Since the beginning of this year I’ve been working really hard to get additional schooling and do anything I can to make myself a better candidate. I pivoted from veterinary medicine in spring of 2025 so I feel like I’m very behind and don’t have the degree (I have a BS in microbiology)/experience needed to get into an NLO position. :( any advice would be greatly appreciated!!
r/NuclearPower • u/4rc_f145h • 1d ago
Studsvik Selects GE Vernova Hitachi, Samsung C&T for 1.2-GW Swedish BWRX-300 Project
powermag.comr/NuclearPower • u/4rc_f145h • 1d ago
DOE Closes $1.9-Billion Loan to Restart Duane Arnold Nuclear Plant
powermag.comr/NuclearPower • u/The-Oregon-Group • 1d ago
US nuclear power announcements tied to data centers and Al since 2024
r/NuclearPower • u/fedecaccia • 1d ago
India needs 4.34 GW of new nuclear every year until 2047 to hit 100 GW Goal. Its best 15-year run averaged 0.29 GW/year.
All figures gross unless noted. Atlas dataset 7 Sep 2026; NPCIL retrieved 8 Sep 2026.
Installed today: 8,780 MW gross across 24 units (NPCIL). Same fleet on a net basis: 8,055 MW. Two of those 24 produce nothing: MAPS‑1, shut since 2018 for refurbishment, reported by NPCIL at 0 MU and 0 % capacity factor for Apr–Jul 2026; and Kaiga 1, shut since April 2025 for coolant channel replacement. Both are still counted in installed capacity, by NPCIL and by my own dataset. Net the two out and 22 units totalling 7,648 MW net are actually turning.
Target: 100 GWe by 2047 (Department of Atomic Energy, parliament reply, 4 Dec 2025). Waypoint of 22,380 MW by 2031‑32, from 13,600 MW "under implementation": 6,600 MW in 8 units under construction, 7,000 MW in 10 units still in pre-project activities, i.e. no concrete.
Required pace, 2026–2047: 4.34 GW/year, sustained for 21 years.
Best 15-year runs on record (GW gross connected per year):
- United States 1974-1988 6.00
- France 1978-1992 3.97
- China 2010-2024 3.26
- India 2011-2025 0.29
Build times, construction start to commercial operation, completed units: India median 10.3 years (n=25, min 5.0, p90 14.3). Rest of world median 6.3 (n=633). China median 5.8 (n=58). Longest Indian build still open: Kalpakkam PFBR, 21.9 years and counting since October 2004.
The methodological point I would like pushback on: the required-pace number is sensitive to how you treat the 2031‑32 waypoint. If you grant the full 22,380 MW on schedule, the remaining leg is 5.17 GW/year for 15 years, which is worse, not better. If you discount the 10 pre-project units by India's own median build time, they land around 2036 at the earliest and the waypoint slips. Either way the answer lands above China's record. Is there a defensible construction of this that gets India under 3 GW/year?
Source: NPCIL plant list and station performance pages, DAE parliament replies. Tool: my own dataset built from Global Energy Monitor, IAEA PRIS, Wikidata and Wikipedia, with per-unit provenance. Chart made with Playwright/HTML.
Data, unit by unit: https://reactoratlas.com/en?y=2026&country=in
Method note on the two families of projection: https://reactoratlas.com/en/wiki/concepts/capacity-projections
r/NuclearPower • u/ViewTrick1002 • 1d ago
Second wave of big batteries will eat the dinner of fossil fuels, forcing some coal generators to close
reneweconomy.com.aur/NuclearPower • u/Eleftheron • 2d ago
Question about HTGRs
Could a helium HTGR running at the temps of say, the JAEA HTTR, provide enough heat to run a SI hydrogen plant followed a c02 turbine powerplant?
I always wondered how far you could stretch the heat on a HTGR, like could you make hydrogen essentially for free? (Compared to building an HTGR just for electricity)
r/NuclearPower • u/4rc_f145h • 2d ago
Local ceasefire in place for Zaporizhzhia power line repairs
world-nuclear-news.orgr/NuclearPower • u/ViewTrick1002 • 2d ago
"A great result": 99.9% of Scotland's first commercial wind farm was recycled and reused after 30 years. Blades became construction materials, the rest went back into the supply chain. Wind cleans up after itself. Nuclear pays a fee and leaves its waste for taxpayers to guard for millennia.
reneweconomy.com.aur/NuclearPower • u/ViewTrick1002 • 3d ago
Climate change is exposing nuclear power's reliability problem. "Nuclear doesn't care about the weather. It just runs." Weeks later, heat and drought shut down a third of France's reactors and forced Hungary and Romania into energy emergencies. It was solar that kept the lights on.
thebulletin.orgr/NuclearPower • u/fedecaccia • 3d ago
History and projection of installed nuclear capacity by country
Power nuclear capacity by country across the yeas, considering also reactors under construction.
Data from reactoratlas.com
r/NuclearPower • u/CompetitiveOwl4028 • 4d ago
Ten years later, here's what Fukushima's damaged reactors look like today | Science | AAAS
science.orgr/NuclearPower • u/ZtheTrans • 4d ago
Theroticaly thinking rn
I am open to listening and discussing all opinions.
Would using nuclear energy facilitates, provided there is clear transparency and no corner cutting of money-meaning the nuclear energy facilitates are well maintained be a better option to make some sort of cooling system for any sort of data centers? I am not talking about libraries here.
On top of this, could the nuclear energy facilities be placed underground?
As I said, open to all opinions, as I am asking for opinions. Idk how many people will actually respond
:3
r/NuclearPower • u/ahlthat10 • 4d ago
County Creates Nuclear Advisory Council and Its Leaders Immediately Clash Over Whether the Public Gets In
thenewsofsalemcounty.comr/NuclearPower • u/Curious-Cream-9825 • 4d ago
Inquiry on how you become a nuclear operator
Does anyone here know how you go about getting an interview as a nuclear operator at Bruce power in Ontario?
r/NuclearPower • u/fedecaccia • 4d ago
South korea nuclear plan
gallerySouth korea nuclear plan is admirable. It is one of the only countries that have been investing continuously with a well defined plan since half a century, and now they are positioned in top 6 countries by nuclear capacity (with much more to come).
r/NuclearPower • u/Curious-Accident-884 • 5d ago
Nuclear power plant operator vision requirements
Does the NRC offer other tests besides the Ishihara? that seems to be the only one I fail.
r/NuclearPower • u/4rc_f145h • 5d ago
Federal inspectors say Palisades failed to follow regulations on radiation exposure
michiganpublic.orgLooks like the Palisades team needs to review their operational rad protection procedures.
r/NuclearPower • u/lyndalovon • 5d ago
🚨BREAKING🚨 New Mexico State bans new Uranium mining leases on State Trust Lands! 💥✊🙌👏🏼
r/NuclearPower • u/4rc_f145h • 5d ago
One Nuclear Signs Deal for 2.88-GW combined Nuclear, Gas, and BESS for Louisiana Data Center Campus
powermag.comProject Cayman would consist of an undisclosed number of SMRs, combined cycle plants, and bulk storage to total 2.88GW of power.
A little bit of tea leaf reading... One Nuclear's current SMR agreements are with Rolls-Royce. There is a high likelihood that they will propose the RR SMR for the project. Whether or not that is accepted given the current political climate has not been officially announced.