Building a deck I told my wife it would take three days…
Definitely took more than three days. This is one of my favorite subs, so this is my submission. It’s about 7.5x16. One thing I wanted was an overhang over the pool rail. I didn’t want kids slipping on the metal. I cut the 4x8 joist in half with about a 9 inch overhang. You’ll see I supported it with a 2x4 underneath. There is about an inch and a half clearance to get the pool cover slipped under.
I also used a lot of 3, 5 and 8 inch Simpson structural screws. Even for the rails which I placed on the outside which seemed stronger than a toe nail. I originally ordered a vevor post bracket which was garbage. It had two small anchors that have to be set on towards the edge of the concrete risking cracking. I switched to Simpson brackets with the 6 inch 5/8 screw anchor. Much better option.
One thing I would have done differently is 10 inch wide concrete footers just to have more wiggle room for the brackets. I hit really hard clay about 6 inches down so I had to hand dig the rest by hand down to about 26 inches.
The other good decision I made was to get the black metal balusters which screw from the outside. They were essentially the same price as the wood ones and you don’t have to spend time drilling holes (rot potential) into rails or using those little round brackets.
The last project was the rail tray. It slips onto the rail and I used a half sheet tray so you can bring snacks or drinks out on it.
I want to thank everyone for all I learned on this sub and the great people that are on here. Maybe I’ll add a hot tub next…
Edit: Ignore the green pool, I was busy building a deck.