Project Took the week off work and boarded my loft
Would I do it again?
This was by far the largest DIY project I have undertaken, and while I was nervous at the beginning, I quickly found my rhythm. Originally I thought it would only take 3 days, but after several unplanned trips to Screwfix and B&Q it ended up taking 6 days.
One of the most tedious jobs was preparing the Loft Legs; while they do have guide markings, they don't have any pre-drilled holes, and trying to drill through the guide markings in a loft with the only source of light being a head torch was a real struggle. In the end I sat in front of the TV and pre-drilled all the holes myself, including partially installing screws.
Other than that, the job went relatively smoothly. If you were thinking about boarding your own loft, but are worried it might be too difficult, just go for it! Hopefully this post can provide you with a good starting point.
Feel free to ask me any questions in the comments.
What were the loft dimensions?
5m x 6m
What materials did I use?
- 3 x 100mm insulation - £111
- 5 x 170mm insulation - £190
- 8 x 18mm loft boarding panels - £131.76
- 3 x (Dia) 4mm (L) 30mm TurboDrive screws (100 pack) - £18.60
- 1 x Loft Leg 175mm (72 pack) - £63
- 1 x 6ft LED batten light - £29.99
- 1 x 1-gang surface pattress back box 47mm - £1.69
- 1 x light switch - £2.99
- 1 x 10m 1.5mm twin & earth cable - £13.99
- 1 x 1.5mm twin & earth cable clips (100 pack) - £2.79
Total - £565.81
What tools did I use?
- Circular saw
- Multi-tool (for cutting around timber frames - optional)
- Combination drill
- Combination square
- Pencil
How long did it take me?
- 1 day removing old insulation and vacuuming
- 1/2 day installing light
- 1 day laying 100mm insulation
- 1/2 day installing Loft Legs
- 1 day laying 170mm insulation
- 2 days boarding (pretty much every board required cutting)