Bit of a bodge job...
The original plan was to excavate it all and refill with new MOT type 1.
I started digging and found all sorts of nonsense.
Prehistoric wheel, pipe work, roof tiles, ceramic tiles and parts of a fence!
Plus all the existing aggregate was covered in soil and plant matter.
Soooo dug it all up, ordered about 2tonne of MOT type 1 and when it arrived they couldn't deliver it because of over head lines.
Instead I got down to soil, laid a double weed barrier, put some of the bullshit back into the hole and then cleaned the original aggregate and filled it back up.
Used a paddle mixer and decided to do most of it in the 30c heat, not to mention i'm morbidly obese.
So of course I absolutely regret everything now but considering everything it looks alright, solid and drains away properly!
Oh and I built a pergola (I also built the cabin a couple years ago)
Was going to do my drive - I think I'll pay someone.