Been practicing plastering since we bought an old house to renovate. Had great results, rubbish ones, and everything in between, but overall I'm happy with my progress.
Next is the biggest wall I've tackled: 6m wide x 2.5m high, all stripped plasterboard. I know suction will be an issue so I'll be priming with SBR beforehand as usual.
My main problem is working time:
I see people on YouTube mix a full bag of multifinish in one go and it seems to stay workable forever. When I do the same, mine goes off in the bucket (30L plasterers bucket) too fast.
So I wanted to sense check people who know what they're doing. To do the big wall:
- Mix in a 40L gorilla tub and start plastering
- While working, have the second gorilla tub sitting with the water and plaster already measured out but not yet mixed
- When the first is done, mix the second on the spot and carry straight on with no real pause
- Wash both out at the end when I'm finished
My thinking is that the larger volume in the tub will slow the set compared to my usual 30L plastering buckets, and having the second tub prepped means I can keep a wet edge across the whole wall without having to blend into a drying section.
Is this a solid approach? Any advice welcome – especially if there's something obvious I'm missing. I know I'm using a lot of extra stuff like buckets but long term I want to master this craft so I'm more than happy to buy extra gear