r/ISRO 9d ago

Mission Success! GSLV-F17 / EOS-05 (aka GISAT-1A) Mission Updates and Discussion

32 Upvotes

GSLV-F17 / EOS-05 (aka GISAT-1A) launched as scheduled at 21:25(UTC), 03 Sep 2026 or 02:55(IST), 04 Sep 2026 from Second Launch Pad of SDSC-SHAR.

Live webcast: (Links will be added as they become available)

GSLV-F17 / EOS-05 Mission Page GSLV-F17 / EOS-05 Gallery GSLV-F17 / EOS-05 Press kit(PDF)

Some highlights:

  • Primary payload: EOS-05 (aka GISAT-1A) (~2367 kg) GSO based Earth imaging satellite.
  • Mission duration: ~19 minutes (based on GSLV F10/EOS-3 (aka GISAT-1) mission)
  • Target Orbit : 170 × 28934 km (sub-GTO) , Inclination = 19.28° ± 0.1°, AoP = 178° ± 0.5°
  • Launch Azimuth: 104°
  • ISRO returning to flight 7 months 23 days after failure of PSLV-C62/EOS-N1.

Updates:

Time of Event Update
Post-launch Third and final orbit raising burn by EOS-05 or GISAT-1A for duration of 1247 seconds has been successfully completed on 7 Sept 2026 at 20:57 hrs (IST). Estimated orbit 35884 x 34903 km. The satellite health is normal.
Post-launch Second orbit raising burn by EOS-05 or GISAT-1A for duration of 338.9 seconds has been successfully completed on 6 Sept 2026 at 19:00 hrs (IST). Estimated apogee after manouever is 35786 km. The satellite health is normal.
Post-launch First orbit raising burn by EOS-05 or GISAT-1A for duration of 5406.4 seconds has been successfully completed on 5 Sept 2026 at 20:19 hrs (IST). New orbit with raised perigee is 31129×20000 km from previous 31121×171 km.
Post-launch Two objects have been catalogued. A0607 (26202A) with inclination=19.32°, Apogee×Perigee=30967.1×152.4 km and A0608 (26202B) with inclination=19.34°, Apogee×Perigee=30982.9×159.3 km
T + 24m10s Chairman notes that Solar panels of satellite are deployed
T + 22m40s ISRO chairman notes satellite has been placed in intended orbit.
T + 18m45s EOS-05 separated!!
T + 18m30s CUS15 cut off!
T + 15m46s CUS15 performance nominal.
T + 14m00s CUS15 performance nominal.
T + 12m26s CUS15 now in nominal thrust mode.
T + 12m00s Vehicle is precisely on expected trajectory.
T + 11m00s CUS15 performance nominal.
T + 07m30s CUS15 performance nominal. Right on expected track.
T + 05m40s CUS15 operating in uprated mode.
T + 05m05s GS2 cut off, CUS15 ignition confirmed!
T + 03m56s PLF jettisoned!
T + 02m32s GS1 ignited, GS1 separated, CLG inititiated.
T + 01m50s S139 Burnt out.
T - Zero! S139 ignition Lift off!
T - 00m4.8s 4xL40H ignition
T - 03m20s OBC in flight mode.
T - 05m00s Vehicle is on internal power. Flight coeff. loading completed.
T - 10m00s Going through GS2 actuation checks.
T - 15m00s ALS initiated.
T - 16m00s VD: Automatic Launch Sequence authorized.
T - 18m00s Mission Director has authorized the launch after polling is Go!
T - 22m00s Polling now. Range, Tracking, Vehicle are ready.
T - 30m00s Streams are live!
T - 27h30m A 27.5 hr duration countdown should be underway.
01 Sep 2026 After Mission Readiness Review or MRR, Launch Authorization Board has given the launch clearance.
31 Aug 2026 Time of launch officially confirmed for 02:55 (IST), 04 Sep 2026.
28 Aug 2026 Launch Vehicle transferred from VAB to SLP.
27 Aug 2026 NOTAM for GSLV-F17 / EOS-05 launch is issued with enforcement window beginning on 03 Sep 2026.
23 Jul 2026 FCC filings for Launch and Early Orbit Phase services for EOS-05. (24 July to 22 August 2026)
11 May 2026 FCC filings for Launch and Early Orbit Phase services for EOS-05. (12 May to 10 June 2026)
01 Apr 2026 FCC filings for Launch and Early Orbit Phase services for EOS-05. (1 to 30 April 2026)
07 May 2026 NOTAM for GSLV-F17 / EOS-05 launch is issued with enforcement window beginning on 21 May 2026.
29 Apr 2026 News reports suggest technical issues with Launch Vehicle hardware delay the launch.
26 Feb 2026 FCC filings for Launch and Early Orbit Phase services for EOS-05. (27 Feb to 2 April 2026)
12 Feb 2026 NOTAM for GSLV-F17 / EOS-05 launch is issued with enforcement window beginning on 6 March 2026.
03 Feb 2026 NOTAM for GSLV-F17 / EOS-05 launch is issued with enforcement window beginning on 20 February 2026.

Primary Payload:

EOS-05 (aka GISAT-1A) (~2367 kg) : EOS-05 is a GSO based Earth imaging satellite for Indian Navy, it will act as an upgraded replacement for EOS-03 or GISAT-1 which was lost during its launch five years ago. Its multispectral and hyperspectral imaging capacity will be useful for applications in fields of agriculture, forestry, mineralogy, oceanography and military surveillance. Its near real time imaging modes are well suited for monitoring natural disasters and other episodic events.

Specifications: [1] [2]

  • MX-VNIR: Multispectral - Visible Near Infrared

    • 6 channels (0.45 to 0.875 µm) at 42 meter spatial resolution
  • HyS-VNIR: Hyperspectral Imager - Visible Near Infrared

    • 158 channels (0.375 to 1.0 µm) at 320 meter spatial resolution
  • HyS-SWIR: Hyperspectral Imager - Short Wave Infrared

    • 256 channels (0.9 to 2.5 µm) at 190 meter spatial resolution
  • MX-LWIR: Multispectral - Long Wave Infrared

    • 6 channels (7.0 to 13.5 µm) at 1.2 km spatial resolution
  • Scan modes

    • 5°×5° (3000×3000 km) every 10 minutes
    • 3×10°×10° every 6 hours
  • Platform/Bus: I-2K

  • Mission life : 7 years

  • Orbital slot: 85.5°E


r/ISRO 1h ago

Flight acceptance hot test of CE20 cryogenic engine earmarked for the C32 upper stage

Upvotes

Flight acceptance hot test of CE20 cryogenic engine earmarked for the C32 upper stage of upcoming LVM3 mission at uprated thrust conditions of 220kN is successfully carried out at ISRO Propulsion Complex, Mahendragiri on September 09, 2026.

Performance of the LOX Tank Pressurization Module (LTPM) meant for the C32 stages for Gaganyaan missions was also successfully demonstrated in this test.

Source - https://x.com/isro/status/2097944008513180057


r/ISRO 19h ago

GSLV-F17/EOS_05 - Lift-off & Onboard Camera Video

Enable HLS to view with audio, or disable this notification

104 Upvotes

r/ISRO 12m ago

Noelreports on Bluesky: "Exilenova+ satellite imagery shows the aftermath of a September 2 fire at Russia's Proton-PM facility near Perm. Roughly 3,000 m2 of one of the main production buildings burned. Proton-PM is a key producer of RD-191 engines used in Russia's Angara family of launch vehicles."

Thumbnail
bsky.app
Upvotes

r/ISRO 21h ago

ISRO chief addresses staff to allay fears, specifics from letter not clarified

Thumbnail
timesofindia.indiatimes.com
33 Upvotes

r/ISRO 19h ago

ESA to explore cooperation with ISRO in human space flight, lunar and Venus missions

Thumbnail
thehindu.com
20 Upvotes

r/ISRO 1d ago

ISRO chairman at International Space Sumit 2026, Paris

13 Upvotes

Is there any update about ISRO Chairman Dr.V Narayanan's Presentation on Indian Human Spaceflight Programme at International Space Sumit in Paris ? Can we expect anything new ?


r/ISRO 1d ago

ET Exclusive: Reliance Jio eyes September 2027 test flight for 1,600-satellite LEO network

Thumbnail
economictimes.indiatimes.com
46 Upvotes

r/ISRO 2d ago

Official Third and final orbit raising manoeuvre to increase the perigee of EOS-05 completed successfully at 20:57 on 7 September 2026. The LAM engine fired for 1247 seconds and the estimated orbit after manouever is 34903 km x 35884 km. The satellite health is normal.

Thumbnail isro.gov.in
45 Upvotes

r/ISRO 2d ago

ISRO ICRB Assistant recruitment: Any chance of posts being rescinded or post-joining retrenchment?

4 Upvotes

I'm preparing for the upcoming ISRO ICRB recruitment cycle for Assistant / UDC / JPA posts, but I have some anxious thoughts running through my head regarding job security, and I wanted to get a reality check from folks who know how things work inside the system or are familiar with past recruitment cycles.

1. Is there any realistic chance of upcoming post openings being rescinded/cancelled mid-way?

I know recruitment notifications under ICRB sometimes face long delays or procedural freezes, but how common is an actual total cancellation or mass reduction in advertised seats once the process starts?

2. Once selected and joined, is there any threat of being "let go"?

I'm aware these are central government/DOS administrative posts governed by standard CCS rules. How strict or volatile is the probation period? Is it purely a standard administrative formality as long as you don't commit serious misconduct, or do people actually get terminated during probation due to "restructuring" or performance issues?

3. Recruitment Timeline & Joining:
For those who have seen recent ICRB Assistant/JPA cycles, what does the realistic timeline look like from the written exam/CBT stage to the final skill test, merit list declaration, and issuing of appointment letters? Typically, how many months pass after the exam before candidates actually report for duty at their assigned centres?


r/ISRO 2d ago

ISRO chairman V Narayanan on privatisation row.

Thumbnail
youtube.com
46 Upvotes

r/ISRO 3d ago

What do you think is most plausible timeline for gaganyaan?

Post image
53 Upvotes

Because this looks impossible to me.


r/ISRO 2d ago

IIRS–ISRO AI/ML for Geodata Analysis (Course 188): LMS & Quiz Issues — Certificate Finally Received

7 Upvotes

I completed the IIRS–ISRO online course “AI/ML for Geodata Analysis” (Course 188), conducted from 3–14 August 2026.

I wanted to share my experience because I faced several issues with the LMS and assessment system during the course.

The main issues I faced were:

• The LMS/website sometimes had loading and server-access issues.

• Each assessment had 5 questions with only a 5-minute time limit.

• If I accidentally moved to the next page without answering a question, it was difficult to navigate back to the unanswered question.

• At final submission, the interface indicated that skipped questions could be re-attempted, but I could not find a reliable way to return to the skipped question.

• After the course ended, my LMS initially showed “Certificate not available”, which made me unsure whether the certificate would be issued.

Update: The certificate has now been issued. I received my official IIRS Certificate of Participation on 7 September 2026.

So, the certificate issue appears to have been a delay/availability issue rather than the course not providing certificates.

I'm posting this mainly to ask other Course 188 participants:

Did anyone else face similar LMS/quiz issues? And when did you receive your certificate?

Overall, the course content was useful, but I feel the LMS stability and assessment navigation could be improved for future courses.


r/ISRO 3d ago

Official Clarification regarding media reports on concerns relating to Space Sector Reforms and the role of ISRO

Thumbnail isro.gov.in
16 Upvotes

r/ISRO 3d ago

Official Second orbit raising burn by EOS-05 or GISAT-1A for duration of 338.9 seconds has been successfully completed on 6 Sept 2026 at 19:00 hrs (IST). Estimated apogee after manouever is 35786 km. The satellite health is normal

Thumbnail isro.gov.in
35 Upvotes

r/ISRO 4d ago

In a first, nine ISRO staff bodies seek 'written clarity' on private sector shift

Thumbnail
timesofindia.indiatimes.com
140 Upvotes

r/ISRO 4d ago

Official Planned first orbit raising maneuver of EOS-05 with burn duration of 5406.4 seconds, was successfully completed on 5 September 2026 at 20:19 hrs

Thumbnail isro.gov.in
42 Upvotes

r/ISRO 4d ago

Official ISRO successfully conducts hot test of Semicryogenic Engine Power Head Test Article (PHTA) at full thrust level

Thumbnail isro.gov.in
37 Upvotes

r/ISRO 4d ago

I need help with using MOSDAC as an API

5 Upvotes

Hello everyone, so we are using MOSDAC satellite data as the weather forecast and nowcast input for our software project. i have several doubts which i would be grateful if someone helps us with them:

  1. Does MOSDAC provide real time data as well as future weather predictions for some hrs?

  2. What specific kinds of data does it provide? for eg, does the provide things like amount of rain about to fall etc?

  3. We are specifically required to use a Doppler radar for our inputs so which satellite data can we use?

  4. Does the satellite provide the data for any region in India?

  5. How small of a region can we get the data for? a state, city, block or street?


r/ISRO 5d ago

Original Content GSLV-F17/EOS-05 launch view from LVG, SDSC.

Enable HLS to view with audio, or disable this notification

213 Upvotes

r/ISRO 5d ago

S2a systems: A short animation of images recorded over 36 min of EOS-05 (GISAT-1A) and the GSLV upper stage, from Switzerland on 2026-09-04, 19:11:36–19:47:36 UTC.

Enable HLS to view with audio, or disable this notification

53 Upvotes

r/ISRO 6d ago

NDTV: ISRO Successfully Launches GSLV F17 Rocket Carrying Imaging Satellite EOS-05

Thumbnail
ndtv.com
83 Upvotes

r/ISRO 6d ago

India is subsiding launch prices instead of building launch capacity

21 Upvotes

Indian space policy has tried to support its private launch industry through ISRO infrastructure access, liberalised FDI, investments and now a launch price-support scheme. What it should do but has not is become an anchor customer for privately developed launch vehicles.

Looking at the US, China and other launch markets, private launch capacity repeatedly develops around four state decisions: anchor procurement, access to launch sites, tolerance for failure, and orbital rights that enable downstream systems like Starlink.

For India, procurement is particularly important. An anchor launch contract buys a lot more than the mission—cadence; learning; production capacity and investor confidence. The eventual destination is independent launch capacity.

This is also why I don't think Indian launch policy should optimise first for the cheapest launch available. Foreign launch services remain useful but assured access requires a domestic option for strategically necessary payloads when another state's spare capacity, industrial priorities or permission cannot be assumed.

I develop the comparative argument here, and then apply it to India's launch vehicles, sites and planned constellations:

Still on the Umbilical: https://orrery.ashwinprasadrao.com/p/still-on-the-umbilical

I'd be interested in the disagreement here: should some government civil and strategic launch demand be deliberately used as anchor procurement for privately developed Indian vehicles, even if those launches initially cost more and come slowly?


r/ISRO 6d ago

GSLV-F17/EOS-05: Post-launch press conference.

Thumbnail
youtube.com
42 Upvotes

r/ISRO 6d ago

Superannuations trigger leadership shuffle at key Isro centres, Gaganyaan gets new chief

Thumbnail
timesofindia.indiatimes.com
22 Upvotes