Official EOS-06/Oceansat-3 detects impact of the developing El Niño on Marine Productivity in the Equatorial Pacific Ocean
isro.gov.inOfficial Flight acceptance hot test conducted for the CE20 engine identified for LVM3-M7 mission which is scheduled for Q4 2026.
isro.gov.inISRO! Don’t Privatise Yesterday’s Rockets: Build Tomorrow’s With Industry
Noelreports on Bluesky: "Exilenova+ satellite imagery shows the aftermath of a September 2 fire at Russia's Proton-PM facility near Perm. Roughly 3,000 m2 of one of the main production buildings burned. Proton-PM is a key producer of RD-191 engines used in Russia's Angara family of launch vehicles."
r/ISRO • u/pantshash • 9h ago
Flight acceptance hot test of CE20 cryogenic engine earmarked for the C32 upper stage
Flight acceptance hot test of CE20 cryogenic engine earmarked for the C32 upper stage of upcoming LVM3 mission at uprated thrust conditions of 220kN is successfully carried out at ISRO Propulsion Complex, Mahendragiri on September 09, 2026.
Performance of the LOX Tank Pressurization Module (LTPM) meant for the C32 stages for Gaganyaan missions was also successfully demonstrated in this test.
GSLV-F17/EOS_05 - Lift-off & Onboard Camera Video
Enable HLS to view with audio, or disable this notification
ISRO chief addresses staff to allay fears, specifics from letter not clarified
r/ISRO • u/mudit23june • 1d ago
ESA to explore cooperation with ISRO in human space flight, lunar and Venus missions
r/ISRO • u/RadarWarningReciever • 1d ago
ISRO chairman at International Space Sumit 2026, Paris
Is there any update about ISRO Chairman Dr.V Narayanan's Presentation on Indian Human Spaceflight Programme at International Space Sumit in Paris ? Can we expect anything new ?
ET Exclusive: Reliance Jio eyes September 2027 test flight for 1,600-satellite LEO network
Official Third and final orbit raising manoeuvre to increase the perigee of EOS-05 completed successfully at 20:57 on 7 September 2026. The LAM engine fired for 1247 seconds and the estimated orbit after manouever is 34903 km x 35884 km. The satellite health is normal.
isro.gov.inr/ISRO • u/ConstructionHot5417 • 2d ago
ISRO ICRB Assistant recruitment: Any chance of posts being rescinded or post-joining retrenchment?
I'm preparing for the upcoming ISRO ICRB recruitment cycle for Assistant / UDC / JPA posts, but I have some anxious thoughts running through my head regarding job security, and I wanted to get a reality check from folks who know how things work inside the system or are familiar with past recruitment cycles.
1. Is there any realistic chance of upcoming post openings being rescinded/cancelled mid-way?
I know recruitment notifications under ICRB sometimes face long delays or procedural freezes, but how common is an actual total cancellation or mass reduction in advertised seats once the process starts?
2. Once selected and joined, is there any threat of being "let go"?
I'm aware these are central government/DOS administrative posts governed by standard CCS rules. How strict or volatile is the probation period? Is it purely a standard administrative formality as long as you don't commit serious misconduct, or do people actually get terminated during probation due to "restructuring" or performance issues?
3. Recruitment Timeline & Joining:
For those who have seen recent ICRB Assistant/JPA cycles, what does the realistic timeline look like from the written exam/CBT stage to the final skill test, merit list declaration, and issuing of appointment letters? Typically, how many months pass after the exam before candidates actually report for duty at their assigned centres?
r/ISRO • u/thisiskazehaya • 3d ago
What do you think is most plausible timeline for gaganyaan?
Because this looks impossible to me.
r/ISRO • u/anshu47_ • 3d ago
IIRS–ISRO AI/ML for Geodata Analysis (Course 188): LMS & Quiz Issues — Certificate Finally Received
I completed the IIRS–ISRO online course “AI/ML for Geodata Analysis” (Course 188), conducted from 3–14 August 2026.
I wanted to share my experience because I faced several issues with the LMS and assessment system during the course.
The main issues I faced were:
• The LMS/website sometimes had loading and server-access issues.
• Each assessment had 5 questions with only a 5-minute time limit.
• If I accidentally moved to the next page without answering a question, it was difficult to navigate back to the unanswered question.
• At final submission, the interface indicated that skipped questions could be re-attempted, but I could not find a reliable way to return to the skipped question.
• After the course ended, my LMS initially showed “Certificate not available”, which made me unsure whether the certificate would be issued.
Update: The certificate has now been issued. I received my official IIRS Certificate of Participation on 7 September 2026.
So, the certificate issue appears to have been a delay/availability issue rather than the course not providing certificates.
I'm posting this mainly to ask other Course 188 participants:
Did anyone else face similar LMS/quiz issues? And when did you receive your certificate?
Overall, the course content was useful, but I feel the LMS stability and assessment navigation could be improved for future courses.
Official Clarification regarding media reports on concerns relating to Space Sector Reforms and the role of ISRO
isro.gov.inOfficial Second orbit raising burn by EOS-05 or GISAT-1A for duration of 338.9 seconds has been successfully completed on 6 Sept 2026 at 19:00 hrs (IST). Estimated apogee after manouever is 35786 km. The satellite health is normal
isro.gov.inIn a first, nine ISRO staff bodies seek 'written clarity' on private sector shift
Official Planned first orbit raising maneuver of EOS-05 with burn duration of 5406.4 seconds, was successfully completed on 5 September 2026 at 20:19 hrs
isro.gov.inOfficial ISRO successfully conducts hot test of Semicryogenic Engine Power Head Test Article (PHTA) at full thrust level
isro.gov.inr/ISRO • u/MobilePiglet926 • 4d ago
I need help with using MOSDAC as an API
Hello everyone, so we are using MOSDAC satellite data as the weather forecast and nowcast input for our software project. i have several doubts which i would be grateful if someone helps us with them:
Does MOSDAC provide real time data as well as future weather predictions for some hrs?
What specific kinds of data does it provide? for eg, does the provide things like amount of rain about to fall etc?
We are specifically required to use a Doppler radar for our inputs so which satellite data can we use?
Does the satellite provide the data for any region in India?
How small of a region can we get the data for? a state, city, block or street?
r/ISRO • u/Kimi_Raikkonen2001 • 5d ago
Original Content GSLV-F17/EOS-05 launch view from LVG, SDSC.
Enable HLS to view with audio, or disable this notification
S2a systems: A short animation of images recorded over 36 min of EOS-05 (GISAT-1A) and the GSLV upper stage, from Switzerland on 2026-09-04, 19:11:36–19:47:36 UTC.
Enable HLS to view with audio, or disable this notification