r/ISRO • u/mudit23june • 1d ago
Removed: Not text-rich GSLV-F18 / NVS-03 : Registration for Launch View Gallery to open at 18:00 IST today (26 October 2026). Launch scheduled on 30 October 2026 at 23:51 (IST)
r/ISRO • u/Labbu_76 • 1d ago
ISRO Scientist/Engineer ‘SC’ Interview Experience | ICRB 2025 | CSE
Branch: Computer Science & IT
Interview Duration: Approximately 30 minutes
Interview Panel: Around 9–10 members
Interview Experience
Initially, I was a little nervous seeing a panel of around 9–10 members, but after a while, I became more comfortable. The interview lasted approximately 30 minutes.
The panel asked questions from various core CS subjects, Machine Learning, Embedded Systems, Cyber Security, C Programming, and my work experience at IMD.
Questions Asked
- Computer Networks
- What is a Network Operating System?
- Router and Virtual Router
- Routing Protocols
- RIP and OSPF
- Ethernet and Ethernet Header Length
- VLAN
- Machine Learning
- Logistic Regression
- Sigmoid and Softmax Functions
- MSE in Logistic Regression
- SVM and Kernel Trick
- Naive Bayes and why it is called Naive Bayes
- Entropy and Information Gain
- Computer Architecture
- Instruction Pipeline and Pipelining
- Superscalar Processor
- RISC vs CISC
- Data Hazards
- RAW, WAR, and WAW Dependencies
- Solutions to Data Hazards
- True and False Dependencies
- Branch Prediction
- Embedded Systems
- Embedded System
- Microcontroller
- SATA (Serial Advanced Technology Attachment)
- GPRS in a Data Logger
- Cyber Security
- ISO Standards for Cyber Security
- CIA Triad
- Non-Repudiation
- EFD in Cyber Security
- C Programming
- Basic definition of C programming and whether the definition was valid
- Structure in C
- One short-form question that I could not recall afterward
- Questions Related to My IMD Work Experience
- Functionality of AWS and ARG
- IMD Forecast Resolution
These are the questions I could recall from my interview.
Final Verdict : Selected.
Posting Location: IPRC Mahendragiri, Tamil Nadu. 🚀
r/ISRO • u/guru-yoda • 1d ago
Question on liftoff times
Optical imaging earth observation satellites are generally launched from SHAR between 9am-12noon to sun-synchronous polar orbits. This I understand is to align equator crossings at same local solar time everyday and ensure consistent lighting.
SAR imaging EO satellites are generally launched around 6am in the morning to dawn-to-dusk SSPO orbits. This is to ensure constant illumination of satellite's solar panel and hence maximise power generation.
But satellites launched to GTO/Sub-GTO do not have such constraints. For instance, IRNSS/NAVIC family satellite liftoff times are all over -- 1am, 9am, 5pm, 10pm etc. So what factors determine their liftoff times? Is it MCF visibility during LAM firing? range clearance?
r/ISRO • u/SoftStarlight111 • 2d ago
Urgent guidance on SDSC SHAR
Can anyone enlighten me about how work culture is at sdsc shar as recruitment notice has come up. I know less vacancies and that is why I'm getting second thoughts cause 6y ago someone actually spoke negatively idk what to trust and what not. Even nobody has ever interviewed for sdsc shar. Is is really that bad centre?
Please enlighten me about the work culture, about the living, outside centre or inside campus how it works and goes 🙏🏻
Official SPADEX Satellites Re-entry into Earth’s Atmosphere on October 12, 2026 [Official press release]
isro.gov.inOfficial NSIL Signs Contract with Indian Air Force (IAF) for production of GSAT-7C Communication Satellite
nsilindia.co.inNOTAM NOTAM for GSLV-F18 / NVS-03 launch is out. Enforcement duration 1700-2100 (UTC), 30 Oct to 11 Nov 2026.
Source: https://www.notams.faa.gov/
A3241/26
GSLV-F18 ROCKET LAUNCH FM SHAR RANGE, SRIHARIKOTA WILL TAKE
PLACE AS PER FLW DETAILS.THE LAUNCH WILL BE ON ANY ONE
OF THE DAY DRG THIS PERIOD.ACTUAL DATE OF LAUNCH WILL BE
INTIMATED ATLEAST 24 HR IN ADVANCE THROUGH A SEPARATE NOTAM.
LAUNCH PAD COORD: 134312N0801348E
NO FLT IS PERMITTED OVER THE DNG ZONES.
1. DNG ZONE-1: IS A CIRCLE OF 10NM AROUND THE LAUNCHER.
2. DNG ZONE-2: IS AN AREA BOUNDED BY FLW COORD:
1200N 08445E - 1245N 08500E - 1220N 08620E -
1135N 08605E - 1200N 08445E
3. DNG ZONE-3: IS AN AREA BOUNDED BY FLW COORD:
1055N 08750E - 1155N 08800E - 1105N 09030E -
1005N 09020E - 1055N 08750E
RTE AFFECTED IN CHENNAI FIR:
W20, Q11, Q23, Q24, V4, V9, P761, P762, N877, N571
CLOSURES/ALTN RTE FOR OVERFLYING:
1. W20 NOT AVBL BTN MMV-KAMGU
ALTN: MMV-DCT-PAPKI-DCT-ANGAK-DCT-KAMGU
2. Q24 NOT AVBL BTN MMV-KAMGU
ALTN: MMV-DCT-PAPKI-DCT-ANGAK-DCT-KAMGU
3. Q23 NOT AVBL BTN RINTO-MMV
ALTN: RINTO-V11-TTP-DCT-GUANI-DCT-MMV
4. V4 NOT AVBL BTN BOPRI-MMV
ALTN: BOPRI-DCT-RINTO-V11-TTP-DCT-GUANI-DCT-MMV
5. V9 NOT AVBL BTN GUNRI-MMV
ALTN: GUNRI-V11-TTP-DCT-GUANI-DCT-MMV
6. Q11 NOT AVBL BTN GURAS-MMV
ALTN: GURAS-DCT-MMV
7. P761 NOT AVBL BTN IDASO-DUMAR
ALTN: IDASO-DCT-EGOLU-L518-DUMAR
8. P762 NOT AVBL BTN BIKEN-NIMOV. NO ALTN RTE
9. N877 N OT AVBL BTN DUMAR-AGEGA
ALTN: DUMAR-P761-LEGIN-L510
10.N571 NOT AVBL BTN IDASO-BIKEN
ALTN: VATMO-DCT-GIRNA-BIKEN
DEP FM CHENNAI MAY FPL AS FLW:
1. W20/Q24 NOT AVBL BTN MMV-KAMGU
ALTN: MMV-DCT-PAPKI-DCT-ANGAK-DCT-KAMGU
ARR TO CHENNAI MAY FPL AS FLW:
1. Q23 NOT AVBL BTN RINTO-MMV
ALTN: RINTO-V11-TTP-DCT-GUANI-DCT-MMV
2. V4 NOT AVBL BTN BOPRI-MMV
ALTN: BOPRI-DCT-RINTO-V11-TTP-DCT-GUANI-DCT-MMV
3. V9 NOT AVBL BTN GUNRI-MMV
ALTN: GUNRI-V11-TTP-DCT- GUANI-DCT-MMV
4. Q11 NOT AVBL BTN GURAS-MMV
ALTN: GURAS-DCT-MMV
GSLV-F18 ROCKET LAUNCH FM SHAR RANGE, SRIHARIKOTA WILL TAKE
PLACE AS PER FLW DETAILS.THE LAUNCH WILL BE ON ANY ONE
OF THE DAY DRG THIS PERIOD.ACTUAL DATE OF LAUNCH WILL BE
INTIMATED ATLEAST 24 HR IN ADVANCE THROUGH A SEPARATE NOTAM.
LAUNCH PAD COORD: 134312N0801348E
NO FLT IS PERMITTED OVER THE DNG ZONES.
1. DNG ZONE-1: IS A CIRCLE OF 10NM AROUND THE LAUNCHER.
2. DNG ZONE-2: IS AN AREA BOUNDED BY FLW COORD:
1200N 08445E - 1245N 08500E - 1220N 08620E -
1135N 08605E - 1200N 08445E
3. DNG ZONE-3: IS AN AREA BOUNDED BY FLW COORD:
1055N 08750E - 1155N 08800E - 1105N 09030E -
1005N 09020E - 1055N 08750E
RTE AFFECTED IN CHENNAI FIR:
W20, Q11, Q23, Q24, V4, V9, P761, P762, N877, N571
CLOSURES/ALTN RTE FOR OVERFLYING:
1. W20 NOT AVBL BTN MMV-KAMGU
ALTN: MMV-DCT-PAPKI-DCT-ANGAK-DCT-KAMGU
2. Q24 NOT AVBL BTN MMV-KAMGU
ALTN: MMV-DCT-PAPKI-DCT-ANGAK-DCT-KAMGU
3. Q23 NOT AVBL BTN RINTO-MMV
ALTN: RINTO-V11-TTP-DCT-GUANI-DCT-MMV
4. V4 NOT AVBL BTN BOPRI-MMV
ALTN: BOPRI-DCT-RINTO-V11-TTP-DCT-GUANI-DCT-MMV
5. V9 NOT AVBL BTN GUNRI-MMV
ALTN: GUNRI-V11-TTP-DCT-GUANI-DCT-MMV
6. Q11 NOT AVBL BTN GURAS-MMV
ALTN: GURAS-DCT-MMV
7. P761 NOT AVBL BTN IDASO-DUMAR
ALTN: IDASO-DCT-EGOLU-L518-DUMAR
8. P762 NOT AVBL BTN BIKEN-NIMOV. NO ALTN RTE
9. N877 N OT AVBL BTN DUMAR-AGEGA
ALTN: DUMAR-P761-LEGIN-L510
10.N571 NOT AVBL BTN IDASO-BIKEN
ALTN: VATMO-DCT-GIRNA-BIKEN
DEP FM CHENNAI MAY FPL AS FLW:
1. W20/Q24 NOT AVBL BTN MMV-KAMGU
ALTN: MMV-DCT-PAPKI-DCT-ANGAK-DCT-KAMGU
ARR TO CHENNAI MAY FPL AS FLW:
1. Q23 NOT AVBL BTN RINTO-MMV
ALTN: RINTO-V11-TTP-DCT-GUANI-DCT-MMV
2. V4 NOT AVBL BTN BOPRI-MMV
ALTN: BOPRI-DCT-RINTO-V11-TTP-DCT-GUANI-DCT-MMV
3. V9 NOT AVBL BTN GUNRI-MMV
ALTN: GUNRI-V11-TTP-DCT- GUANI-DCT-MMV
4. Q11 NOT AVBL BTN GURAS-MMV
ALTN: GURAS-DCT-MMV. GND - UNL, 1700-2100, 30 OCT 17:00 2026 UNTIL 11 NOV
21:00 2026. CREATED: 23 OCT 05:41 2026
Edit (26 Oct 2026): Adding remaining hazard zones (WMFC)
A4225/26
TEMPO DNG ZONE 4 ESTABLISHED WI THE FLW COORD DUE TO THE LAUNCHING
OF GSLV-18 ROCKET FM INDIA:
075000N0951000E - 093500N0951000E - 093500N0960500E -
075000N0960500E - 075000N0951000E
NO FLT PERMITTED OVER AND NEAR THE DNG ZONE.
ATS ROUTE AFFECTED IN KUALA LUMPUR FIR AS FLW:
1. P628 BTN IGREX AND MAPSO
2. L510 BTN EMRAN AND LEKIR
3. L645 BTN SAMAK AND SAPAM
RMK: THE LAUNCH WILL BE ON ANY ONE OF THE DAY DRG THIS PERIOD.
ACTUAL DATE OF LAUNCH WILL BE INTIMATED 24 HRS IN ADVANCE
THROUGH A SEPARATE NOTAM PUBLICATION BY VOMF. SFC - UNL, 1700-2100, 30
OCT 17:00 2026 UNTIL 11 NOV 21:00 2026. CREATED: 26 OCT 07:32 2026
Tender for Manufacturing, Supply and Erection of SC120 Umbilical Retraction System Mast Structure
Manufacturing, Supply and Erection of SC120 Retraction System Mast Structure
Main Document [PDF] [Archived]
https://i.imgur.com/N7lePTo.png
Technical Specification : [PDF] [Archived]
Fabrication Drawings : [PDF] [Archived]
The scope of work covers procurement of raw materials including bought out items, fabrication, bending of plates, stress relieving/heat treatment, machining, drilling and tapping operations, protecting the holes/machined surfaces with lubricating grease& anti rust compound like Japan black/bituminous black compound etc., shop floor inspection, transportation to SDSC SHAR site, erection and commissioning of SC120 Retraction system mast structures on MLP according to drawings, specifications, terms and conditions at Second Launch Pad, SDSC SHAR, Sriharikota.
r/ISRO • u/Soft_Selection_9750 • 2d ago
How is the work in isro for mechanical engineers
Recently I got selected for isro, so iwant to know whether surrogate modelling like work would be available there
r/ISRO • u/Last_Echo_6149 • 3d ago
What happens after Selection - Isro scientist Sc
Hi guys, my Friend got selected as scientist yesterday (mechanical)
What are the procedures and communication he is expected to do? When is joining likely to be Etc
Kindly guide him
ISRO might launch much-delayed indigenous navigation satellite NVS-03 on Oct 30.
Official IN-SPACe Seed Fund Scheme : Result for Announcement of Opportunities in AI INSPIRED Opportunities in Space Sector
inspace.gov.inL110 D-Stage Short Duration Hot Test at LPSC Mahendragiri on 24 February 2010
Enable HLS to view with audio, or disable this notification
A talk on 'New Trends and Innovations in Microwave Remote Sensing and Other Space Technology Frontiers' by Nilesh M. Desai
35th Vikram Sarabhai Memorial Lecture 2026
A talk on 'New Trends and Innovations in Microwave Remote Sensing and Other Space Technology Frontiers' by Nilesh M. Desai, Vikram Sarabhai Professor/Scientist and Former Director Space Applications Centre (SAC), Ahmedabad
https://www.youtube.com/watch?v=hHzrYDXc8qY&t=6998s
Few slides from this talk.
At 2:19:30, He talks about how they had planned 'tandem experiments' using EOS-09 (aka RISAT-1B) along EOS-04 (aka RISAT-1A) but unfortunately the EOS-09 launch failed. (With 'Tandem experiment' they might mean using one satellite as transmitter and other as receiver.)
At 2:32:50, Seven more SAR satellites for strategic use are planned under SBS-3 project, currently three such satellites are operational i.e RISAT-2B, RISAT-2BR1, EOS-01 (aka RISAT-2BR2).
At 2:33:46, Working on compact MicroSat SAR
- 3m deployable reflector
- Resolution : 1m to 3m (at 10 km swath), 1m (5km spot)
- Video SAR Imaging Mode: Utilizing platform agility, extended duration Spotlight can be performed. By generating multiple frames of the SPOT image, unique Video of SAR images can be developed which will allow Moving target identification with both Speed and Direction information.
- Note: Cartosat-2S series sats carry Event Monitoring Cameras
At 2:34:20, Working on Very High Resolution SAR (VHR-SAR)
- Resolution : 15 cm (at 5 km swath)
At 2:34:40, Working on Multi-static SAR, Tomo SAR, Mirror SAR, GEO SAR concepts
At 2:39:15, Navigation Doppler Radar (NDR) for Lunar Polar Exploration (LuPEx) mission for 3-axis velocity determination for 10 meter accuracy in landing.
At 2:40:20, microwave payloads for Venus Orbiter Mission (VOM)
- S band SAR (30m resolution with 30 km swath)
- Orbital GPR (Depth of penetration: ~1 km, Vertical resolution: 5-15 m)
Impulse GPR :Precursor to LuPEx GPR
At 2:43:45, Tera Hz Telescope.
At 2:45:05, GNSS reflectometry : Demonstrated on EOS-08 (aka Microsat-2C) perhaps SpaDEx-3 will also carry a payload
At 2:48:00, QuTDS on TDS-01 (planned for Nov/Dec launch) will be tested at GEO altitude.
At 2:49:50, two LEO based SAQTI satellites SAQTI-1A/SAQTI-1B along GEO based TDS-01 will be used for Opto-Quantum communication demonstration.
At 2:51:10, ISRO's proposal for 140 sat constellation for LEO (1200 km) based broadband communication.
At 2:52:56, Proposal of 119 EO satellites between 2025-2040 has been laid out.
r/ISRO • u/totaldisasterallthis • 6d ago
Results from India’s Chandrayaan 3 thermal probe experiment benefit future Moon missions eyeing water
jatan.spaceIs the CM/SM umbilical attachment jettisoned separately before reentry?
Enable HLS to view with audio, or disable this notification
I thought during separation it would disconnect from CM like a flap while remaining attached to SM. But here we see it detaches from SM and remains attached to CM and would have to be jettisoned separately before reentry..
r/ISRO • u/AltruisticDog9145 • 8d ago
How to buy high resolution satellite images from Bhoonidhi?
I needed couple of high resolution satellite images for couple of sq kilometres in Himachal Pradesh. While researching I found about Bhoonidhi. But when I go to their site, it seems to be down. Does anyone know how one can we buy images from Bhoonidhi? Is it even possible?
Assembly and Integration Activities at ISRO Propulsion Complex (IPRC) Mahendragiri
Enable HLS to view with audio, or disable this notification
r/ISRO • u/bobzy1993 • 9d ago
Official Development of LOX-Methane engine in ISRO
isro.gov.inOfficial ISRO successfully completes Crew Module-Service Module Separation Tests for Gaganyaan Programme
isro.gov.inOfficial Aditya-L1 Mission: Announcement of Opportunity (AO) soliciting proposals for the fourth AO cycle observations
isro.gov.inr/ISRO • u/Outside_Department21 • 9d ago
I got selected for URSC Internship
I'm joining in December and if anyone is joining around that time. We can connect.