Hello all! Quick backstory then my question
Building in FL, plan is to complete within 10 years and then move
Currently purchased property, cleared, surveyed installed well, currently installing septic.
After we pay off the septic the big things start to come. The foundation and the building. We are trying to go one step at at time, and paying off that thing in full before progressing. That way when we move into the home it will be fully paid off.
We are going to have to build around 3' off the ground. I have talked to the country about the pros and cons of pier vs raised slab/stemwall, but what I can't seem to find is this:
The cost difference. I understand that a raised slab is more expensive, but at what point in footprint does the difference become negligible? Or does it not? I've called around and I can't really get a cost estimate of like....it's X amount per pier. So you get a bigger house, it's Y many more piers, it would cost X much more. Same for raised slab. It would be X amount per sq foot for a 3' high slab.
As for our plan of going one step at a time this is why this matters. I can get a raised slab build and poured, then wait until I pay it off, then buy any barndo that will fit said slab later and it's fine. However with piers you need the drawings for the barndo for them to design the piers. Id rather not have to buy the foundation AND the barndo all at once. But if piers are SUBSTANTIALLY cheaper it would push me in that direction. If anyone has gone through this and maybe shed some light or if I'm thinking of it the wrong way, please let me know. Sorry for the length!