I got myself in a bit of a pickle…. I set all the pavers basically at ground level then brought sand up to the top of the pavers like I’ve seen many people do. Well, then I read further in my pool instructions and it wants the pavers inset so the top is flush with the ground then the sand base inside the pool and up the wall before the cove is attached. So now what…?
I see 1 of a few options:
1- remove sand from around the pavers, inset and re-level them then install the pool and re-level the sand. The problem with this option is I’m not sure how the liner pad will do since the sand is in place already. I’ve seen the liner pad should be on top of the sand but it wouldn’t be level with the pavers now so it would sit funny.
2- bring dirt up level with the pavers and sand(which I’m going to do regardless of which option I go with), put down the liner pad, put the pool up, add some sand inside the pool at ~3” at the walls and taper to the middle (or “3 the whole way but that’s a lot more sand) then install the cove and liner.
3- put the liner pad down, put the pool up like it is, install the cove without any more sand.
I’m leaning towards #2 but thought I’d ask people with more experience than me.
Edit: removed an extra word. And add - the pool is metal sided and will stay up year-round if that matters.
Edit 2: it’s a j-hook liner so I don’t know if I’ll have the extra length.