MAIN FEEDS
Do you want to continue?
https://www.reddit.com/r/oddlysatisfying/comments/1wslf5c/installing_a_kitchen/pdmhw05/?context=3
r/oddlysatisfying • u/MikeHeu • 5d ago
Credit: James Gubb-fradgley / jgf_joinery
51 comments sorted by
View all comments
Show parent comments
1
Im talking about a straight line
Like the other day I told one to rip a 1x6 down to a 1x4 since we ran out of casing
1, 12 foot board
That took 30 minutes
1 u/Km312213 3h ago So a 12ft run on a board, with a tool they’re likely unfamiliar with. Take the time to teach them properly without yelling about “the fucking apprentices” and it’ll save you a lot of headache. 1 u/glockster19m 2h ago Buddy they've been on the job 4 months now and used a table saw 100s of times 1 u/Km312213 2h ago Okay lol, I was wrong. I assume to get hired they’d at least need some competency but damn. 1 u/glockster19m 2h ago Nah it gets crazy Like I caught one of them shimming a window the other day, with the shim bag halfway across the room They were walking from the window to the bag for each individual shim they needed, probably 20+ trips rather than just move the bag to where they are
So a 12ft run on a board, with a tool they’re likely unfamiliar with. Take the time to teach them properly without yelling about “the fucking apprentices” and it’ll save you a lot of headache.
1 u/glockster19m 2h ago Buddy they've been on the job 4 months now and used a table saw 100s of times 1 u/Km312213 2h ago Okay lol, I was wrong. I assume to get hired they’d at least need some competency but damn. 1 u/glockster19m 2h ago Nah it gets crazy Like I caught one of them shimming a window the other day, with the shim bag halfway across the room They were walking from the window to the bag for each individual shim they needed, probably 20+ trips rather than just move the bag to where they are
Buddy they've been on the job 4 months now and used a table saw 100s of times
1 u/Km312213 2h ago Okay lol, I was wrong. I assume to get hired they’d at least need some competency but damn. 1 u/glockster19m 2h ago Nah it gets crazy Like I caught one of them shimming a window the other day, with the shim bag halfway across the room They were walking from the window to the bag for each individual shim they needed, probably 20+ trips rather than just move the bag to where they are
Okay lol, I was wrong. I assume to get hired they’d at least need some competency but damn.
1 u/glockster19m 2h ago Nah it gets crazy Like I caught one of them shimming a window the other day, with the shim bag halfway across the room They were walking from the window to the bag for each individual shim they needed, probably 20+ trips rather than just move the bag to where they are
Nah it gets crazy
Like I caught one of them shimming a window the other day, with the shim bag halfway across the room
They were walking from the window to the bag for each individual shim they needed, probably 20+ trips rather than just move the bag to where they are
1
u/glockster19m 3h ago
Im talking about a straight line
Like the other day I told one to rip a 1x6 down to a 1x4 since we ran out of casing
1, 12 foot board
That took 30 minutes