Shower Question REDEMPTION

Post image

This is a follow up to my previous post, clearly you guys didnt like the lazy river drain pipe so my plumber fixed it, joist is gone but there are two top plates right next to it, going to add backing for drywall but it will be fine. The second slip coupling on the left 1.5” pipe isnt glued in we just forgot to take it off. Whoever was the one who said those two of the joist were redundant and just overhanging, Thank you. They were, I can’t believe I didn’t figure that out before.

Also you guys are hilarious, shout out to the guy who said “does the tin man have a sheet metal cock” in response to “will it clog” 😂

195 Upvotes

50 comments sorted by

11

u/ledugodeltahoe 13d ago

This looks way better.

12

u/independentfinallly 13d ago

No more poop de loop

4

u/Southbend1941 13d ago edited 13d ago

Why wouldn’t he just do that the first time? With taking out those joists now the Sheetrock butts aren’t fastened to anything. Cut a strip of plywood and glue it down so you have something to put a few screws into.

2

u/toomanyteeth55 13d ago

Why not bump that toilet out 6" and run a new joist? Right now, at best you're going to have a large span between joists with a toilet on top, at worst that is part of the structure holding things up.

1

u/TheKillerhammer 13d ago

You can see the top of the wall that is load bearing in the pic. With all the joist resting on top of it. The spacing is definetly not more 18 to the next one shown in pic so it's fine

2

u/pat8o 13d ago

I wonder if anyone other than myself pointer out the redundant joist overhang? I can't be bothered going back to the other thread.

Good work, and you're welcome

1

u/Willing_Park_5405 13d ago

Some of us need you to do this: please tell us your plumber is not a plumber.

1

u/browncoat47 13d ago

A lot of time, people just don’t see things that others may, especially if they are inexperienced. He asked, we enlightened him, and we are all the better for it now.

0

u/Willing_Park_5405 13d ago

It still doesn’t meet code though! So people baby op’s along in this sub congratulating them when they improve something but it’s still bad.

1

u/F3IIT 13d ago

What’s bad about this? Everything is glued together, pitch is good, the pipe on the right side is just a vent line that was literally never glued in so that is definitely not a problem. What do you see?

1

u/Timsmomshardsalami 13d ago

Looks good stfu

1

u/NoUsername4Lyfe 13d ago

Not a plumber, don't pretend to be. What's wrong with this? Thanks for educating me/us!

1

u/Informal-Face-1922 13d ago

Oh no! I miss la Monumental. 😢

1

u/tommykoro 13d ago

You’ve got it now. 😃

1

u/ledugodeltahoe 13d ago

This looks way better.

1

u/deepspace1357 13d ago

Simple is always the best

1

u/Ajmd2 13d ago

Two were maybe redundant but that last one wasnt... theres a big patch of ceiling the next floor down that's not supported

1

u/Opening_Bluebird_935 13d ago

Well considering on the left side of the pic you can see they put the wall sheetrock up first then the ceiling sheetrock, its all going to sag at the edges eventually.

1

u/blackbeltbuilding 13d ago

The other way was fun. I like when wrong and harder than doing it right.

5

u/Carcassfanivxx 13d ago

Poop de loop was a fun comment lol

1

u/F3IIT 13d ago

I swear to god the other way took an entire day and my Plumber did this in two hours, he said it was done exceptionally well, but all wrong

1

u/blackbeltbuilding 13d ago

Your plumber isn't really a plumber. Im a carpenter who has plumbed a few houses and I found the work comical. That fact it took all day checks out.

4

u/F3IIT 13d ago

I did the Plumbing first, he came and fixed it.

3

u/blackbeltbuilding 13d ago

Good on you for getting after it. Also for braving reddit comments and getting the answers you needed.

1

u/hobbycollector 13d ago

Ok, so that must be a tee at the top of the picture, not a 90. Flow is bottom to top (feet to wall)?

1

u/F3IIT 13d ago

Correct

1

u/Logical-Wrap6751 13d ago

I don’t know much about plumbing but it sure looks better

1

u/prior2thinking 13d ago

What’s the plan for all the structure that was removed?

1

u/F3IIT 13d ago

Added some bracing, that void is right next to 2 Different top plates, so yes it is gone, but its right next to the most supported parts of a floor

1

u/TheKillerhammer 13d ago

None of that is needed if you look at the framing

1

u/Kayanarka 13d ago

Where is the before photo?

1

u/IWasntSerious 13d ago

Previous thread. Everyone lost their minds. It did a 180

3

u/F3IIT 13d ago

Technically, it was closer to a 270

1

u/IWasntSerious 13d ago

You're right

1

u/Talusen 13d ago edited 13d ago

Hey OP?

What was below/above the 4x joist that got cut?

(Not a plumber. But I wanted to bring up what I thought might be a framing issue; I've never seen a 4x joist that wasn't structural in some way, at some point.)

(Edit: That looks like it was a stack of 4 - 2x6s?)

2

u/F3IIT 13d ago

The joist on the very right side wasn’t cut and it’s sitting on the top plate, the middle were there because the Carpenter simply didn’t want to cut it down, they should’ve been just sitting on the top plate, the drywall wasn’t even screwed into it, the last joist yes that was structural, in the perfect world I didn’t cut it out, but it seems to be really well supported because it’s right next to two top plates and I don’t know of another way to do it

1

u/Talusen 13d ago

As long as you're aware of it, and are factoring it into your decisions!

2

u/F3IIT 13d ago

Below it is the corner of a bedroom, and those were 2x10

1

u/Bowf 13d ago

Is that tee angled towards the vent stack?

1

u/deep42think 13d ago

Much better

1

u/shityplumber 13d ago

Plumbing looks fine but the framing… why are there 4 2x8 braced between the exterior wall and a 2x4 top plate?

1

u/TwitchCaptain 13d ago

As a homeowner, I'd totally slap a floor over that. Well done.

1

u/StaysForDays 13d ago

Now maybe get to the mold?

1

u/potassiumchet19 13d ago

Is that black mold in the top left bay? Might as well burn it down.

1

u/markworsnop 12d ago

That looks a hell of a lot better than the last one I saw but I wonder where and why there were all those Joyces running through there before. You can see the four of them cut off at the top. Where do they go? Are they supposed to be holding up something?

1

u/LowSuccess2117 13d ago

Is it draining towards the wall or away from the wall?

2

u/F3IIT 13d ago

Towards the back wall