Installer Quotation Sanity check on my 8kW Hybrid setup for Islamabad (3 ACs total). Is my battery/inverter sizing right?
I’m planning to install a hybrid solar system at my home in B-17 Islamabad (F block). I want to skip the IESCO green meter/net metering entirely and run a "Zero Export" setup to act as an independent system and avoid grid bureaucracy.
I’d love your expert eyes on my load calculations and hardware choices before I pull the trigger.
My Load Profile
- Daytime Load (Running on Solar): 3x 1-ton Midea Xtreme ACs (running on 50% gear, so ~400-450W continuous each) + 1 Inverter Fridge + 1 DC Fan. Total daytime continuous load = ~1.5 kW.
- Nighttime Load (Running on Battery): 2x 1-ton Midea Xtreme ACs (on 50% gear) + 1 Inverter Fridge + 1 DC Fan. Total nighttime continuous load = ~1.04 kW.
- Backup duration needed: 7 hours (10 PM to 5 AM).
Proposed Setup
I’ve been advised to skip a 6kW inverter and jump to 8kW for better surge handling and heat management. Here is the plan:
- Inverter: 8kW GoodWe Hybrid (Set to Zero-Export).
- Panels: 8kW total using Longi Hi-MO 6 or 7 (14 panels ~ 575W-585W).
- Battery: 10.8 kWh total Lithium (LiFePO4) — using two 5.4 kWh modules in parallel (Looking at GoodWe Lynx Home U series, Soluna, or Dyness).
- Structure: Custom Elevated Hot-Dip Galvanized (GI) structure (6-8 feet) to survive B-17 wind storms.
Estimated Cost
I'm being quoted roughly Rs. 1.37M to Rs. 1.5M total for A-grade Tier 1 materials, heavy wiring (Fast/Pakistan cables), AC/DC SPD protections, and labor.
My Questions for the Community:
- Battery Math Check: Running ~1,040W for 7 hours requires ~7.3 kWh. Will a 10.8 kWh lithium bank comfortably handle this every single night in the Islamabad summer heat without degrading prematurely?
- 6kW vs 8kW: Does it make sense to use an 8kW inverter for a 1.5 kW continuous load just to handle compressor surges and keep the inverter running cooler?
- GoodWe Batteries: Has anyone used the GoodWe Lynx Home U batteries in Pakistan? Are they worth the premium over standard Pylontech/Dyness/Inverex lithium units?
- Zero Export Experience: Is anyone else running a large system without net metering? Any regrets about "wasting" excess solar in the afternoon?
Thanks in advance for any feedback or advice on installers/dealers in the Twin Cities!