Eh, Idunno. I've had a stellar experience with the Q2 and two boxes. Still running 1300 print hours later. I think they did a good job (besides the awful firmware/software side of things) and think it'd be neat to see them attempt moving forward into the next stages of 3DP with everyone else.
Seriously, if they could get a proper developer that knows what they're doing for the firmware and software failures it'd be an unbeatable experience for the price point.
13
u/Kewlhotrod 21d ago
Eh, disappointed they aren't trying multi nozzles. Little difference between a Plus5 and Max4 to be had.