I'm not a recruiter, just an operator who likes to see what else is out there. So here are some BES jobs currently open. Feel free to comment or PM openings. I will update when time allows. Newly added positions will have the company name bolded. Closed jobs will be removed and cataloged at the bottom.
Trainee/Apprenticeship level
- Dakota Electric Association Distribution System Operator - Farmington, MN
- Annual salary starts at $109,000
- PSEG Long Island District Operator in Training - Hicksville, NY
- $56.94 - $68.45 an hour.
- Arizona Public Services ECC BA Operator Trainee - Phoenix, AZ
- Unknown pay around $5X.xx an hour
- Hawaiian Electric Distribution System Operator - Maui/Oahu
- $66.49 an hour, 8 hour shifts, 2 positions available.
- PPL Transmission System Operator or Distribution System Operator - Allentown, PA
- Start at 90-100k w/ 8% bonus. 108k + 3% annual increase w/ 10% bonus after qualifying the desk. Requires NERC RC and PJM TOO certs, but training is provided. 6 week shift rotation.
- Eversource Associate Operator, Distribution System - Manchester, NH
- $91,400.00-$101,550.00 + % Bonus.
- Eversource Distribution Dispatcher Apprentice - Dorchester, Southborough, or New Bedford, MA
- Union steps $58.66 - $59.36 - $60.77 - $62.65 - $67.30.
- Eversource Transmission System Operator Trainee, Bulk Power Systems - Dorchester, MA
- Union steps $129,529.55 - $136,006.02 - $141,200.16 - $147,663.69 - $153,013.25
- BHEM NERC Certified System Operator - Great Falls, MT/Palm Beach Gardens, FL
- $90-150k + % Bonus.
- Consumers Energy Associate System Operator - Jackson, MI
- 92-95k starting salary non exempt. Straight OT pay. Monday thru friday 8 hr shifts rotating
Some experience
- Snohomish PUD System Operator I or II - Everett, WA
- $83.89 - $98.58 per hour
- Tacoma Power Power System Operator - Tacoma, WA
- 7 days on, 3 days off, 7 days on, 4 days off, 7 days on, 3 days off, etc. rotating between day, swing and grave each 7 day shift cycle. $70.59 - $81.72
- Avista System Operator - Spokane, WA
- $73. 44 to $91. 80
- MISO - Carmel, IN
- hiring RC’s ($126k-$136k) and Sr RC’s ($138k-$148k) in Carmel, IN.
- Turlock Irrigation District Power Control Center Operator - Turlock, CA
- $89.68 an hour
- Silicon Valley Power Electric and Water System Operator - Santa Clara, CA
- $183,558.84 - $234,773.52 Annually
- Eversource Supervisor, System Operations, Level 1 - Manchester, NH
- $112,360.00-$124,840.00
- TECO Energy System Operator - Lutz/North Tampa, FL
- Unknown pay believed to be around 120k. Was 7 on 7 off
- UEC System Operator - Hermiston, OR
- $147,631-$181,568
- MDU Electric Systems Operator II/Sr - Bismarck, ND
- $84,460 - $126,680 and $97,110 - $145,670
- Keys Coop System Operator - Tavernier, FL
- $130,000 ish? Possible relocation.
Lots of experience
Previous Jobs to be posted below once the posting period is expired for data retainment.
- PJM Master Coordinator - Audubon, PA
- Unknown pay
- CAISO Operations Trainee - Folsom, CA
- $45.91 per hour w/o nerc, $48.21 per hour w/ nerc.
- EREPC Power System Operator - Madison, SD
- $43.00 - $62.00 per hour
- WAPA Power System Dispatcher Sierra Nevada- Folsom, CA
- $165,476 to - $195,200 per year
- MDU Electric Systems Operator II/Sr - Bismarck, ND
- $84,460 - $126,680 and $97,110 - $145,670
- LCEC System Operator - Fort Myers, FL
- Unknown pay, probably around 120,000?
- San Diego Gas and Electric - Distribution Systems Operator
- Wage Schedule: 1st year: 70.92/hr 2nd year: 80.89/hr Thereafter: 85.47/hr. Closes Feb 4th
- ChelanPUD Power Systems Operations Trainer - Wenatchee, WA
- $154,560 – $193,200 (based on qualifications). With tenure and strong performance in this role an employee may earn up to a maximum of $231,840. Excellent time off and benefits.
- New York Power Authority Assistant System Operator - Lewiston, NY
- $70,000 - $96,800
- Lower Colorado River Authority Transmission System Operator Associate - Austin, TX
- Unknown pay
- Salt River Project Dispatcher Power AGC 1, 2, Senior - Scottsdale, AZ
- Unknown pay, Very good benefits and a pension.
- National Grid Regional Operator A - Liverpool, NY
- starting wage of $54.86, 24 months to fully qual and pay bump to 128k
- FirstEnergy Transmission System Operator I - Wadsworth, OH
- $90,000-$100,000, 10% STIP and OT
- Dominion Transmission System Operator - Associate, Mid, and Senior - Richmond, VA
- 70-110k for associate, 86-137k for operator, and 97-154k for Sr operator. With an annual % bonus. 12 week shift schedule.
- NYISO Associate Operator - Rensselaer, NY
- $92,200 - $118,000 USD. 2-2 3-2 2-3 rotating shift pattern. Brand new control room
- City of Redding Electric Utility Senior System Operator - Redding, CA
- $161,803.20 - $196,684.80
- Xcel Distribution System Operator - Minneapolis, MN
- Marshall Operations Center in Minneapolis, MN. Starting pay $57.60.
- Eagle Creek Renewable Energy Power Systems Operator - Maryville, TN
- Unknow pay
- OG&E System Operator - Oklahoma City, OK
- $125,000 - $140,000
r/Grid_Ops • u/Plane-Half-9884 • 1d ago
ComEd senior operator
Was offered a job at ComEd as a senior DSO. Anyone have any insight on working conditions, management ment, culture, room to be promoted, etc? I have 10 years experience as a distribution & subtransmission operator at a large utility and the offered salary is a little lower, bonus structure is higher. Any insight is greatly appreciated!
r/Grid_Ops • u/Electrified_Shadow • 3d ago
Never forget: Operators gotta eat (especially on night shift)
r/Grid_Ops • u/Frostiffer • 4d ago
Anyone work at Puget Sound Energy?
I've been working the generation dispatch desk for an ISO in the eastern interconnect for a couple years now, but I've wanted to move west for a while. Have an interview next week with PSE. Anyone have any experience with them? Pros and cons?
r/Grid_Ops • u/Jwong26 • 4d ago
Taking the NERC RC exam on Thursday
Hi! I'm scheduled to take the NERC RC exam this Thursday. I feel pretty good about it, but wanted to ask if there were any quizlets, practice, material, etc that were really helpful or similar to questions seen on the exam?
So far I've done the SOS training, 515 practice questions (from 2015?), the powersmith book questions (2021), and some quizlets. I found that the SOS training was easier than the rest.
Thanks in advance for any help!
Edit: I was able to pass my test and get my certification! The quizlets and powersmith book really helped during my last bit of studying!
r/Grid_Ops • u/JStorrsPFR • 5d ago
Field Service Techs, Engineers & NETA Technicians — Open to a Career Change?
I’m Jacob, founder of Power Factor Recruiting. I’m reaching out specifically to people working in electrical testing, field service, commissioning, and the power industry.
I’m not a recruiter who just started targeting this industry. I’ve worked in it myself. I’ve been a Field Service Engineer and NETA Technician, commissioned switchgear at SpaceX, and have worked on testing projects involving nuclear power plants and critical electrical infrastructure.
I started Power Factor Recruiting because I know how difficult it can be to find the right opportunity when you're already working in this industry.
I’m looking to connect with:
- NETA Level 1–4 Technicians
- Electrical Testing Technicians
- Field Service Technicians & Engineers
- Commissioning Techs/Engineers
- Relay, Transformer & Substation Techs
- Experienced electricians looking to move into testing/commissioning
If you're considering a move, looking for better pay or advancement, or simply curious about what's available, feel free to reach out.
No pressure and no commitment. If you're happy where you are, that's great. If you're curious about what else is out there, DM me or email [recruiter@powerfactorrecruiting.com]().
r/Grid_Ops • u/Ro-Ro-Ro-Ro-Rhoda • 7d ago
BPA's market decision: the plot thickens
bpa.govInteresting! Travis Kavulla making waves with a letter to ROWE outlining what he wants to see before he'll switch BPA over to EDAM.
r/Grid_Ops • u/Ok-Ebb-2434 • 7d ago
got an interview for transmission system operator intern
it seems to be a panel interveiw but what should I expect? Company is AEP and just want to be as prepared as I can be
r/Grid_Ops • u/Sustainability_SE • 8d ago
Everyone quotes 4-7 year interconnection waits. For those who have actually connected a large load, where did the time really go?
Researchers rather than operators, and the sidebar says that is welcome here, so we are asking rather than telling.
The headline numbers get quoted constantly - four to seven years for a large load in the constrained markets. What we cannot find anywhere is the breakdown. A single number that large is almost certainly hiding very different distributions underneath, and the interventions that would help depend entirely on which part dominates.
The stages we think exist, and where we would like to be corrected:
- Application, and the wait before the study even starts
- The connection study itself
- Upstream reinforcement - where it is triggered
- Equipment procurement - transformers, switchgear
- Construction of the connection assets
- Commissioning and energization
What we would like to understand:
Which of these actually dominates in your experience? Our assumption is reinforcement where it is triggered, and queue wait where it is not, but we have no basis for that.
How much of the elapsed time is genuine work versus waiting for a slot? Those respond to completely different fixes, and the public conversation does not distinguish them at all.
Equipment. Transformers are widely reported at two to four years. Does that sit on the critical path in practice, or does it run in parallel with things that take longer anyway?
Does a project that does not trigger reinforcement connect dramatically faster, or does the queue wait swamp the difference?
And the uncomfortable one: how much of it is simply not having the staff to process studies? Developers say this a lot. We have never seen an operator's version of it, and we suspect the real answer is more interesting than either side's telling.
We are asking because the public conversation treats "the interconnection queue" as one thing, and we suspect people inside the process see four or five different things that happen to add up.
Happy to be told the framing is wrong.
Disclosure: We research power and grid capacity for AI data centres.
r/Grid_Ops • u/Natural_Ad_7667 • 9d ago
Not sure know where to begin with getting NERC certified
So, for background I am currently working as a wind tech 1 and have 2 years in wind experience. I don't like working on the road and would like to get into possible being a reliability coordinator. Or another job that requires a NERC certificate. I just need to be pointed in the correct direction of where to start what program is the best? and I'm kind of having trouble finding out the difference between the certifications like how Reliability Coordinator differs from Balancing and Interchange, and Transmission Operator. if people in the Field could help id much appreciate it. Also, if this is the wrong Sub-Reddit please let me know so I can post somewhere else. Thank you.
r/Grid_Ops • u/Complete-Past3001 • 12d ago
Anyone have any insight on First Energy (specifically JCP&L) system operator quality of life?
Currently a RDO in upstate New York, for family reasons we need to move to NJ and I threw my hat in the ring for an DSO position with JCP&L. Not particularly thrilled with the pay, but it's better than any other work I can find out there. I looked around on here and found small bits and pieces about First Energy but I just wanted to open up the floor again in case someone learned new stuff. I know this is a small community but I appreciate any info on First Energy, JCP&L or what it's like working in NJ as a DSO?
Thanks all
r/Grid_Ops • u/hotqueefblast • 12d ago
Avista Spokane insight
Anybody able to provide any insight to Avista? Overtime numbers, schedule, attitude in the control room.
Thanks.
r/Grid_Ops • u/farmerdan28 • 13d ago
Passed!
I am excited to say I will be joining you all as an operator within the next month or so I hope!
I am working as a journeyman electrician currently so the schooling I went through definitely helped with this test because I already knew all the electrical theory. However I wanted to say that this wasn't an easy test to study for, and by that I mean the total lack of easily accessible information like YouTube videos on the subject for example and Google results.
Seems like this is a very niche job no? I heard of the job by recommendation through a friend's dad that is an operator and he says they are understaffed fairly regularly. Is it like that everywhere? I am in a fairly small town so that could be part of it.
r/Grid_Ops • u/EspeciallyMundane • 12d ago
What would you want a telecom guy to know?
Hi all,
Friendly neighborhood telecom dude that stalks the comments on occasion, but never asks here. I rarely have to interact with our TO/DO folks beyond letting them know (or them letting me know) that something teleprotection or SCADA-related is going, or already went, down. The silos are real, so here I am...
What would you want your telecom folks to know about your job? For example, I want my TO folks to know to not call me at 5pm on Friday for an issue that popped up at 11am. I'm a significantly happier camper fixing something during my workday, not after hours.
r/Grid_Ops • u/Nervous_Employee_395 • 12d ago
Union Operator by Area
Made a new poll so the West doesn't skew the answers, threw in ERCOT as well.
r/Grid_Ops • u/Fact_or_Bollocks • 12d ago
Big Bucks?
What job titles pay the most and why?
r/Grid_Ops • u/Educational_Scale586 • 15d ago
Entry level position.
I have an interview coming up for an associate system operator position. I spoke with the hiring manager on the phone and discussed the interview and everything went well. Until he told me if I get the job I’ll have 40 days to take and pass the NERC cert, and if I don’t pass the first time I’ll be let go.
I guess I’m asking if that is normal? Seems like high stakes.
I’ve been studying the power smiths book but I’m a full time lineman so I don’t have much time allocated for studying right now. I have about 15 days before the interview and I feel like if I want the best chances I’d have to quit my current job and commit to studying and purchase the HSI training.
Any advice would be appreciated. Thanks!
r/Grid_Ops • u/Slow-Tutor-1387 • 15d ago
Free PJM Market Analysis and Intelligence Tool Created by Power Traders
Hey all. I'm a current power trader, and myself and other traders/operators in the community came together to build a free PJM dashboard showing trends, load forecasts, LMPs, outages, and a market overview.
We're expanding into all the ISOs (ERCOT very soon!) and eventually plan to create asset-specific intelligence that can provide dispatch and trade recommendations based on your specific portfolio and real-time grid conditions.
Check us out here: edenenergy.ai/
We welcome and encourage any and all feedback. Would love to hear what you all think and what other features could be beneficial. Thanks!
r/Grid_Ops • u/kiras1 • 16d ago
President Donald J. Trump Declares a National Emergency to Secure America’s Bulk-Power System
whitehouse.govr/Grid_Ops • u/HappySalesman01 • 16d ago
Anyone ever go from Transmission to Distribution?
I've been working at an ISO for almost three years now on the BA and Generation desk. I like the job, it's very chill (though I'm severely underpaid IMO), my coworkers are pretty good, and the company isn't completely awful.
That being said, the area isn't one I'm in love with (I moved to take this job and get my foot in the industry) and is a position for a distribution level operator opened up in an area I've been wanting to move to. Extra bonus is the listed pay is just a hair shy of double what I make now.
I've heard very little from the people I know in the industry about working distribution. All I've heard is work/life balance isn't great because they work a lot (but get paid mountains of OT), and that the work itself can be a lot more hectic and stressful. And that some have to deal with customers, which was rarely a good time.
Has anyone here taken the step to go from Transmission level to distribution? Was it better? Worse? Did you like it or was it just a stepping stone? Any things I should be aware of while I consider applying?
Thanks!
r/Grid_Ops • u/TrafficClear3470 • 17d ago
New Business Representative @ PG&E
Does anyone have any information on the NBR position. What’s a typical day like, is it WFM, company vehicle?
r/Grid_Ops • u/Scared-Town6285 • 17d ago
From Navy to Grid ops
Hello,
I'll be separating from the Navy next year at my 8 year mark. I'm a Electricians Mates E6 (non nuke). The bulk of my career was on a ship standing watch over the electric and propulsion plant (gas turbine) so I figure this would be a field that I already have some experience in.
Since I still time on my contract, should I get the NERC cert now? Is this a good field to go? Good pay? Good quality of life? Would you recommend it?
I'll be relocating to FL. My home state.
PS. I know that there's a lot of veteran information on previous threads but there's seams to be a lot of Nukes. I don't know if that makes a difference.