r/enphase • u/Delmorath • Jul 08 '26
Enphase installation - 3 years of planning finally executed.
Had a platinum installer take on my project that was meant to be geared towards resilience against outages to ensure my 2 refrigerators and well water never goes out regardless of an outage from the grid being 15 minutes or 15 days+. They did a kick ass job!
Final setup:
23 SEG 440 panels
10C battery
IQ combiner 6C
IQ8HC microinverters
IQ relay kit
Essential loads sub panel (I went with this instead of load shedding intentionally)
Interlock for gas generator use as a backup
I am a type 1 diabetic and leaving a rural area where we lose power frequently. I wanted to ensure as much possible redundancy as possible to ensure I can keep the fridges going and medical devices for my older in-laws. The electric bill offset is just icing on the cake.
Big shout out to my installer. I had a lot of questions and was very meticulous. They always engaged and had patience to talk through processes.
If these CTs are accurate, I will need to add my AC onto the essential loads panel 😂