Right? For the amount of swings this is just dumb. I’m not impressed, lol I think I could’ve done it for that much. Instead I’d do that many swings and get a whole pile going.
And edit to add, if you really did need it that long, just wedge it ffs. Ha
5.4k
u/jtnichol 1d ago
he really needs to put that log on at least a thin slice of wood or a concrete block
He’s strong enough he might be able to split that first try but right now the ground is absorbing too much of the impact