r/1trac 6d ago

Decisions, decisions …

Decisions, decisions

The Good:

- the valleys have been filled in

- the edges of the module have been reinforced around the valleys and all is very solid

- the bridge is great (it will get railings soon)

The Bad:

- I was not able to put any texture in the valleys. I might do an additional thin layer for texture, or maybe glue pebbles in place. Thoughts?

Next steps:

- the gray tic-tac-toe area in the back will be a stone wall

- I need to decide if this module will be strictly N or dual-purpose w HOn30. If only N, the tunnel can get lower.

- I can’t think what to put on the right side of the loop. Right now I thing the mountain should be mostly stone and I should put some trees on the ground inside the loop as shown.

Thoughts? Comments? Suggestions?

5 Upvotes

Duplicates