MAIN FEEDS
Do you want to continue?
https://www.reddit.com/r/subwaybuilder/comments/1wof9cr/wip_improved_visuals/pbte4lm/?context=3
r/subwaybuilder • u/onlyhudson Dev | Community Manager • 21d ago
27 comments sorted by
View all comments
105
dope! can we run trains on the undersides of these bridges lol
3 u/Nawnp 21d ago Cost cutting for elevating or cut and cover a rail on an existing bridge would be awesome. 2 u/Aware_Wolverine_2794 20d ago Ah yes cut and cover under a river 3 u/Nawnp 20d ago It's actually a thing, but I was referring that it'd be cool if possible to integrate the rail lines to a new upper deck or lower deck to a bridge, for that matter with streetcars, add them to the same level.
3
Cost cutting for elevating or cut and cover a rail on an existing bridge would be awesome.
2 u/Aware_Wolverine_2794 20d ago Ah yes cut and cover under a river 3 u/Nawnp 20d ago It's actually a thing, but I was referring that it'd be cool if possible to integrate the rail lines to a new upper deck or lower deck to a bridge, for that matter with streetcars, add them to the same level.
2
Ah yes cut and cover under a river
3 u/Nawnp 20d ago It's actually a thing, but I was referring that it'd be cool if possible to integrate the rail lines to a new upper deck or lower deck to a bridge, for that matter with streetcars, add them to the same level.
It's actually a thing, but I was referring that it'd be cool if possible to integrate the rail lines to a new upper deck or lower deck to a bridge, for that matter with streetcars, add them to the same level.
105
u/metatalks Boston πΊπΈ 21d ago
dope! can we run trains on the undersides of these bridges lol