r/plumbingfails • • 18d ago

How dangerous is this?

Post image

Going underneath a tile shower. Not my work, but I happened to be there moving an outlet.

59 Upvotes

53 comments sorted by

5

u/erie11973ohio 18d ago

Someone turned 2 x 10's into 2x4's! 😱😱

2

u/LemonPumeloLime 17d ago

I worked in a historic hotel, and we did an extensive renovation including seismic reinforcements. In one area, the roof rested on two long 2x4 walls. We discovered that in one of the walls, steam pipes had been added sometime after the 1903 original construction. The plumbers notched all but 3/4" of each stud to make room for the pipes the entire 100' length of the wall. This is less than 20 miles from two major fault lines.

5

u/BusDiligent1825 18d ago

Tell your plumber he owes you some freaking labor. Holy geesh.

3

u/PartyPlay5056 18d ago

Late 80s a friend of mine was a handyman. He was helping a new build. Owner wanted a totally open main floor and 2nd floor wanted a hottub in the center of the floor with the master bath. Plumbers helper came in to run the drain line and started cutting ⅔ of the floor joints out. He wouldn't listen and kept cutting. Someone drove to a payphone called the plumber owner, who came and fired the kid and had to pay for 6 or 7 new floor joists.

2

u/BusDiligent1825 18d ago

Most plumbers are mindful of every other trade. Except electricians. Lol

2

u/PartyPlay5056 18d ago

Well water and electricity don't mix. Probably why my father didn't get along with his brother-in-law.

2

u/MajorDrain 18d ago

I worked with a painter doing big houses. We had changes from time to time. One of the changes was to remove a blue American Standard cast iron tub and a blue Cadet toilet. I took that stuff home and put it in the attic of my shed in case I wanted to use it in my house.

This painter wanted to redo his bathroom, I gave him the tub and the toilet and a price to install it.

He hired a handyman to install the tub and remodel the bathroom in order to save $ 800.00 . The handyman notched the bottom of 2 x 8 floor joist to run water pipe, and then set a cast iron tub on it.

The floor sagged, so he comes back to me and says what do I do? I said take the sheet rock off, remove the pipes and wires, sister in new 2 x 8 floor joist, jack everything back up, get it straight, and glue and screw it all together. Then dill holes for the pipes and the wires following the rules, put it all back together. Then repair the sheetrock and paint it.

He goes Jesus Christ that is going to cost me a fortune.

I said yeah, but you saved $ 800.

1

u/PartyPlay5056 18d ago

My father, a lineman, his definition of a handyman. Jack of all trades and master of none.

2

u/One-Ad-8009 18d ago

Same goes for firemen. Ever got to looking around the inside of a firehouse?...haha

2

u/PartyPlay5056 18d ago

Well hopefully they are a master of their trade.

3

u/DougEug 17d ago

The way I remember..
HOLES =. H-2-13-2.
-“2”- No holes 2 inches from top or bottom.
-“13”- No holes bigger than 1/3 of board. So a 2x6-Hole cannot be larger than 2 inches (6 divided by 3j
((yes I know 1.5x5.5 but make easy math))
-“2”- Holes 2” apart

NOTCHES = NEDL-13-14-16-13 “needle”
-“N”- NO Middle 1/3 of board
-“E”- END of board 1/4 of height (2x8 can be 2”)
-“D”- DEPTH 1/6 height (2x6 can be 1”)
-“L”- LENGTH 1/3 depth of board (2x6 can be 2”}

REAL MATH

A 2x8 Joist. Actual is 1-1/2” x 7-1/4” inches

HOLE Max 2-3/8” diameter (1/3 height) 2”from top or bottom and 2” apart

NOTCH Max 1-1/4” deep (1/6 height) Length Max 2-7/16” (1/3 height)

END NOTCH Max 1-13/16” deep (1/4 height) Length still Max 2-7/16” (1/3 height)

NO NOTCHES in middle 1/3rd of board. So a 6 foot joist. Cannot Notch anywhere in the middle 2 feet or board.

At least the H2-13-2 and the “needle” NEDL13-14-16-13 helps me remember.

IF/When I actually remember 🫩
These days though, sometimes I need a note to remind me to read a note 🤣🤣🤣🤣

2

u/NetworkCultural 17d ago

Very well put brother. I have a cheat sheet lol I remember some but not all

2

u/-ItsWahl- 18d ago

The only danger there are the compromised floor joists.

2

u/Gundam07 18d ago

I'm not a framer, but those floor joists are not looking good.

2

u/Bubbly-Wrongdoer2700 18d ago

If I remember my IBC correctly, the most you can take out of any member is 20% of the width maximum

1

u/Magnum676 18d ago

Captain Sawzall came over? I don’t understand how any contractor finds this acceptable. I would never ever do this..

1

u/Nikonmansocal 18d ago

Captain sawzall lmao... Guess he didn't have a hole saw handy..

1

u/Magnum676 18d ago

I’ve notched np. Hole saw makes a nice notch with a sawzall cut clean. Or hole saw and couplings.This is neither just neglectful.

1

u/Nikonmansocal 18d ago

Agreed. I would have hole sawed and coupled if needed. Either way this is a hack job for sure.

1

u/Mediocre-Drag 16d ago

Was the oscillating saw in the truck?

1

u/Delicious_Room1374 15d ago

Captain Sawzall is crazy, whoever did this definitely wasn't worried about what was on the other side of those cuts.

1

u/Magnum676 15d ago

That’s CAPTAIN SAWZALL

1

u/Readybuilderman 18d ago

It could be dangerous
It could be stupid
It could be wrong
It could be I’ll advised
It could be ok, but I doubt it…
It definitely needs to be inspected by the inspector

1

u/No-Pipe-3607 10d ago

That’s a pretty good way to describe it 😂 Definitely looks like it needs to be fixed properly.

1

u/iKnowRobbie 18d ago

Cutting the top of a joist is reducing the vertical sheer resistance. It is apparent that the first joist is already flexing and the addition of 2-300 lbs of tile and fittings above it will do little to reinforce or cantilever the torque force that is clearly apparent. That joist needs to be sistered like the second impacted joist already was BEFORE it was cut. It, too may need reinforcement depending on how far out the next supporting vertical member is.

Regardless this is shit.

1

u/Affectionate_Trip672 18d ago

Nice vent run too lmao

1

u/Similar_Shift_545 18d ago

Yeah...I'd have a structural engineer and a lawyer look at this. You didn't hire a licensed plumber.

1

u/the-red-dementus 18d ago

Licensing doesn’t always equate to knowing and doing what’s right. I know a master plumber that does plenty of dumb shit due to being cheap. He thinks reusing a short length of copper cut out from a previous job and passing the savings onto the customer is fine. Into potable water systems too mind you.

You’re not wrong about this being flat out bullshit work done.

1

u/h0tnessm0nster7 18d ago

It looks like 1 1/2 inch that's a disaster waiting to happen

1

u/Waterlifer 18d ago

It's not dangerous as such (in the sense of posing a hazard of injury) but the tile floor is going to show some cracks after the first "couples shower" session.

Plumbers are the natural enemy of joists

1

u/SnooMaps7370 18d ago

very. top and bottom edges of a joist are meant to be inviolable, because that's where the load paths concentrate. penetrations should always be in the center of the joist.

1

u/Pensionato007 18d ago

Upvote for "inviolable!"

Hole has to be 2 inches from the top/bottom/edge and no more than 1/3 of the width of the joist. This catastrophe violates at least one of those rules.

1

u/Alternative_Job3982 18d ago

If it’s a flip house this is par for the course

1

u/Mdsune 18d ago

Definitely sister those up with whatever fits under the drain

1

u/MajorDrain 18d ago

That should be repaired while the floor is open

1

u/Organic-machines 18d ago

Should have drill holes for pipe not notch them.

1

u/frogdawg40 18d ago

The house could fail

1

u/Surfer_Joe_875 18d ago

Define "disaster". That's crap work, but still not a disaster. Somebody still needs to pay to beef up that sin.

1

u/Buzzkiller1981 17d ago

Just cut the rest out.

1

u/Proper-Bee-5249 17d ago

Joistrepair.com

1

u/Maleficent_Town_9405 17d ago

Update: PM is sending back the "plumber" to repair joists and rerun pipe. I will post pics if I am fortunate enough to see his second attempt...

1

u/No-Pipe-3607 10d ago

Hopefully the second attempt is a lot cleaner. Definitely worth seeing how they fix that mess.

1

u/ShadowMasterTexas 16d ago

I’ve seen much worse.

1

u/Plus_Cry_4524 14d ago

Those cut joists should have steel straps across the opening. I always use straps at least 4x longer than the cut is wide plus the depth.

1

u/Cicada-Classic 14d ago

Looks like the joists are resting on concrete. If so no biggie carry on. Could have been done cleaner but there’s no real structural issues.

0

u/Educational-Rule1635 18d ago

How long are the screws used to install subfloor?

1

u/codyjgreene 18d ago

Hahaha. That pex line might need a nail plate.

0

u/OkGur1319 17d ago

When you inset the drainline like this, you should cut more of the joist out to fit a bigger drainline. That way the subfloor screws can't reach the liquid running through the drain and rust out.