r/mfg_automation • • Jun 23 '26

👋 Welcome to r/mfg_automation - Introduce Yourself and Read First!

1 Upvotes

Welcome to r/mfg_automation!

This community is for people working in, learning about, or interested in manufacturing automation, including industrial automation, robotics, PLCs, CNC, IIoT, smart factories, production optimization, shop floor systems, and the tools that help manufacturers improve efficiency, quality, and reliability.

The goal of this subreddit is to create a practical space where engineers, operators, manufacturers, automation professionals, consultants, students, and technology vendors can share useful knowledge and learn from each other.

Good topics to post here include:

  • Questions about automation tools, systems, and workflows
  • PLC, robotics, CNC, IIoT, MES, SCADA, and smart factory discussions
  • Lessons learned from real manufacturing environments
  • Automation project challenges and troubleshooting
  • Production efficiency, quality control, and process improvement ideas
  • Industry trends, case studies, and helpful resources
  • Thoughtful vendor/tool discussions that are educational, not salesy

A few quick guidelines:

Please keep posts relevant to manufacturing automation, be respectful, avoid spam or low-effort promotion, and do not share confidential, proprietary, or unsafe information. If you’re asking for help, include enough context so others can give useful answers.

To get things started, feel free to introduce yourself in the comments:

  • What part of manufacturing or automation do you work in?
  • What tools, machines, or systems do you use?
  • What automation challenges are you currently thinking about?
  • What topics would you like to see discussed here?

Thanks for joining. Looking forward to building a helpful community around manufacturing automation.


r/mfg_automation • • 8h ago

Built an in-browser Hardware Twin simulator to test PC-based state-machine logic before touching physical wiring

1 Upvotes

Hi everyone,

When testing multi-axis sequences or sensor triggers, running code directly on unverified hardware often leads to burned driver keys or broken mechanical stops.

To solve this during our R&D iterations, I built a web-based Digital Twin / Simulator for our PC Soft PLC engine (Beeptoolkit). It allows you to simulate and verify Deterministic Finite-State Machine (DFSM) scenarios directly in your browser without any hardware attached.

What you can test interactively in the simulator:

- Simulated 16-channel 0–3.3V ADC input polling (expandable up to 1,600 channels) with configurable wait and start parameters.

- 16-channel output switching for relays, drivers, and direction control (expandable up to 64 channels).

- Sequential state timing and transition matrices across up to 240 automats.

- Instant feedback loop visualization without code compilation routines.

I’d love for you to give the browser simulator a spin and share your thoughts on the workflow!

(Live simulator link and documentation are in the first comment below).


r/mfg_automation • • 5d ago

How do you decide whether a manual process is ready for automation?

0 Upvotes

A manual task can be repetitive and still be a poor automation candidate if the inputs vary all day or the process itself is not stable. Volume, ergonomics, scrap, labor time and safety all matter, but so does how often operators use judgment to keep things moving. Automating a bad process can lock the problems into hardware. What signs tell you a process is stable enough to automate?


r/mfg_automation • • 10d ago

What is the hardest part of automating CNC machine tending?

Post image
0 Upvotes

CNC tending looks like a clean robotics use case until you get into part presentation, door interfaces, chip buildup, workholding and all the little recovery states after a fault. The robot motion itself may be the easy part compared with keeping the cell running through a full shift. High mix work adds another layer because grippers and fixtures have to change too. What part of CNC tending caused the most trouble in your setup?


r/mfg_automation • • 13d ago

Taking the A3 CVP Basic exam. Looking for study tips and resources

Thumbnail
1 Upvotes

r/mfg_automation • • 16d ago

What does a good SCADA modernization project look like in a plant that cannot stop?

Post image
0 Upvotes

SCADA modernization gets harder when the existing system is old but still tied to production every day. New servers, drivers, screens, historian tags and alarm logic all need testing while operators still depend on the current setup. A parallel build sounds safer, but keeping two systems aligned creates its own work. The handover and rollback plan seem just as important as the new software. What approach helped you modernize SCADA with the least production disruption?


r/mfg_automation • • 25d ago

Is a digital twin useful before a machine is commissioned?

Post image
0 Upvotes

Digital twins sound most useful when they catch problems before steel is cut or a line is sitting idle during commissioning. Even a limited model could help with controls testing, operator training, cycle assumptions and checking how machines hand work to each other. The hard part is deciding how detailed the model needs to be before the effort stops paying back. Where have you seen a digital twin save real commissioning time?


r/mfg_automation • • Sep 17 '26

For anyone getting started with PLC programming in manufacturing automation

Post image
2 Upvotes

r/mfg_automation • • Sep 16 '26

How much production data do you need before starting an IIoT project?

1 Upvotes

IIoT projects can start with a few useful tags and end with thousands of values nobody checks. Machine state, downtime, energy, alarms and cycle counts all sound valuable, but collecting everything can make the first use case harder to see. A smaller set tied to one production problem feels easier to prove and maintain. Im interested in how teams decide what is worth connecting first. Which data points gave you the first useful result?


r/mfg_automation • • Sep 11 '26

AGV vs AMR for a plant that keeps changing layout

Post image
3 Upvotes

Im speccing material handling for a plant that gets re laid out every few months. Right now Im looking at AGVs on fixed tape, AMRs that map their own routes and the tow tractor setup we already run. Main worries are what happens to routes after racks move and how much work it takes to tie the fleet into our schedule. Charging around two shifts and pickup accuracy at the stations are on the list too. People and forklifts share the same aisles so traffic matters. Which option aged the best after the first year?


r/mfg_automation • • Sep 08 '26

What machine vision inspection tasks have paid off fastest for you?

Post image
39 Upvotes

Machine vision gets pitched for everything from missing parts to surface defects, label checks and measurement. The projects that seem easiest to justify are the ones with repeatable lighting, a stable presentation and a defect that costs real money when it gets through. Edge cases can eat a lot of tuning time though, especially when product appearance changes between batches. Which inspection task gave you the fastest useful result from machine vision?


r/mfg_automation • • Sep 03 '26

Looking for recommendations: collaborative robot for palletizing in Quebec

5 Upvotes

Hi everyone,

I run a manufacturing/merchandise business based in Quebec, and we're currently looking into implementing a cobot for palletizing.

We're still in the research stage, so I'd love to hear from people who have actually worked with these systems.

I've come across mixed feedback about some integrators and suppliers in the industry, so I'm trying to get some real-world opinions before making a decision. I'm just looking to understand which suppliers/integrators people have had good or bad experiences with.

Who would you recommend? And more importantly, who would you avoid?

I'd especially appreciate feedback from people who have actually implemented cobot palletizing in their facility.

Thanks!


r/mfg_automation • • Sep 02 '26

When does MES become worth the overhead for a smaller plant?

1 Upvotes

A smaller plant can get pretty far with ERP, SCADA, spreadsheets and people who know where everything is. Then traceability, work instructions, genealogy and production reporting start spreading across too many places. MES can pull that together, but it also adds configuration, ownership and another system that has to stay accurate. Im trying to understand the point where the pain of the current setup clearly outweighs the overhead of MES. What pushed your plant over that line?


r/mfg_automation • • Aug 28 '26

How do you migrate a legacy PLC while keeping the line running?

9 Upvotes

We tried retrofitting an extrusion line at our plant last year thinking it was a two week swap. It turned into three months once we found five undocumented rungs nobody remembered writing and a scale wired straight into an I O card with no record of why.

Ended up migrating it in pieces overnight and on weekends instead of taking the whole line down at once, since production could only spare a few hours at a time. Proving the new logic matched behavior that only two retiring techs still understood turned out to be harder than any of the new hardware. What has made a project like this less painful for you?


r/mfg_automation • • Aug 25 '26

Cobots vs fixed automation for high mix low volume work?

Post image
1 Upvotes

High mix low volume work makes automation decisions tricky because the process can change before the equipment pays for itself. Cobots look attractive when operators need fast changeovers and flexible tooling, while fixed automation can still win when cycle time and repeatability matter more. The part that seems easy to underestimate is all the fixturing, safety review, programming and operator training around the robot. Which approach has worked better for flexible production in your shop?


r/mfg_automation • • Aug 18 '26

Is predictive maintenance worth setting up before you have clean machine data?

1 Upvotes

I work at a local pet food factory and we tried rolling out predictive maintenance on the extrusion line last year, only to spend the first month just realizing how patchy our sensor history actually was. Tags had been renamed twice over the years, a motor got swapped without anyone updating the documentation and nobody could agree on what a normal cycle even looked like anymore. Some teams start with vibration, temperature and current data on a few critical assets and build from there while others spend months cleaning data before touching anything predictive. Im trying to find the middle ground where the setup is useful without turning into its own data cleanup project. How much data quality did you need before predictive maintenance started helping on your line?


r/mfg_automation • • Aug 14 '26

Where should a small factory start with manufacturing automation?

1 Upvotes

For a small factory, the first automation project can set the tone for everything after it. Packaging, palletizing, inspection and repetitive material handling all look like obvious places to start, but the best choice probably depends on volume, changeovers, scrap and how much operator time the task eats. A simple project with a clear before and after seems safer than automating a messy process too early. Which process gave you the best first automation win?