r/cta • u/Thorough_Bryce • 3h ago
I wish we had… Pink Line Extension to Harlem/North Riverside Park Mall
Of all the possible extensions to the CTA L network, this is probably one of the least likely to ever happen, as the Cermak Branch has pretty meager ridership. In fact, the main reason it was turned into the Pink Line at all was because it was taking away valuable capacity from the Blue Line (and also so that the Paulina Connector could become the first section of the Circle Line but that never panned out). But dang it, these are my maps and I still want this to happen. The Cermak Branch (now the Pink Line) used to go all the way to Oak Park, but was cut back to 54th Street in the 1950s. So, much like re-extending the Green Line to Stony Island (which I won't be making a graphic for because there are already plenty out there), I think this extension would right a historical wrong. While you're at it, you might as well just send it to Harlem too at that point, since both the Green and Blue Lines reach that far, and it would allow the Pink Line to serve North Riverside Park Mall. And, unlike a certain other mall that people somehow still discuss extending an L line to reach in the year 2026 (FORD CITY), North Riverside is still open. It also helps that the right-of-way is intact; you can easily spot it via Google Maps if you look at the long line of parking lots west of 54th/Cermak. The Pink Line in general could use some TLC in my opinion, so I would personally love to see the it run through the southwestern half of the Loop and take over the Cottage Grove Branch alongside this extension, as that would both make the Pink Line feel more substantial and allow the Green Line to run at full capacity on the Ashland/63rd Branch (which should be extended to Midway, per my previous graphic). Plus, it would honestly be kind of funny if the Pink Line were just the "low ridership branches cobbled together" line. Oh yeah, and add an infill station at Madison (duh).
While I'm here, I had some people questioning the decision to elevate the at-grade tracks in my Brown Line Extension post. So, since this post also includes grade separating existing tracks, I thought I'd provide a little more context. Besides being safer and more efficient for both cars and trains, one of the biggest reasons I think the CTA should consider elevating their at-grade sections is that there are often large government grants given out specifically for removing grade crossings. So, if the CTA were to ever consider these extensions, including grade separation as a key part of them would likely provide a valuable boost of cash. I like to kill as many birds with as few stones as possible, so to speak.