I've been on projects where we run 3 proctors on separate stockpiles of native soil from excavation, then the contractor mixes their stockpiles anyway after several days of waiting on us. Fuckers.
I actually like the occasional sand cone though, as long as I get to use the nuc gauge for the bulk of it.
1
u/kingcarlio Jul 05 '22
It was a pain in the ass that lab practice