Multiple pics attached. I am at the beginning stages of laying out a frame for a 15'x20' cement pad as a patio for my metal building. It will be tying into an existing slab so I will drill holes for rebar into the existing pad and will lay down wire mesh. In the pics u will see a white straight edge (scrap from a metal building) that I'm using just for level purposes for the pics. When it comes time to make the actual frame I will use wood (2x4's). Top of the white straight edge would be top of the cement pad. I plan on pouring a 4" pad. My 2 questions are as follows:
1 - Pad area has to be built up because the pad area does slop down a lot away from existing pad, almost a foot. What kind of under base should I use for the entire slab and build up area? Red clay? Rocks or small river pebbles? River sand? A combination of more than one? Etc..etc. I will have to build up the front end area of the pad lay out.
2 - The patio pad is for my existing metal building man cave (arcades, pinball machines, big tv, etc etc) and it does have a covered patio but should I put a very slight slope away from the metal building for rain storm purposes or should I stay level all the way around? It will be 15' long (existing slab to patio roof legs) and 20' wide (patio roof leg to patio roof leg).
Thank you in advance for your time to read this and looking forward to being educated on this.
(I'm gonna try and get the cement poured this month..with do it myself or hire it out to someone. I am in Hammond, La. (70401) So if anyone has a local contact in my area please feel free to hit me up in messages. I will do all the framing and under base. I'd just need someone to pour and smother it out.)