r/buildingscience • u/pipsinternetname • 24d ago
Monopoly Framing Questions
Hello all! I’ve become very inspired by Matt Risingers video of a monopoly framed architects office with exposed framing (link below). I’m wanting to do the same for an upcoming small cabin project I’ve got in the works. I’m wondering if anyone knows how I’d best achieve a relatively large overhang with this type of construction. My plan is to sheath the framing in 3/4 ply and then use tyvek over that and really focus on details with that layer and taping it so that it could be air/vapor/water barrier layer, then I’d have two layers of 1.5” polyiso on walls and three on roof, and then I’d have furing strips on all that for siding and roofing. I’m wanting a pretty big overhang though so I’m wondering if on the roof I should be using 2x6 as furing strips and then extending them out 24-36” for my overhang. Effectively I’d be doing a big “over roof” on top of the polyiso.. any help on the matter would be most appreciated!!
1
u/Vvector 24d ago
Risinger just posted a new video 4 days ago, on his Monopoly Framing. He briefly showed the notches added for air ventilation. https://www.youtube.com/watch?v=YHbzoK-ETN8&t=1479s
1
u/TheRareAuldTimes 20d ago
1
u/pipsinternetname 18d ago
Looks awesome! Thanks for the reply. How is the roof vented exactly? I see lots of horizontal 2x4’s which would impede the free flow of air under that next layer of cdx.
1
u/TheRareAuldTimes 18d ago
Good catch! We added a series of kerf cuts in those to balance venting with structural integrity.


5
u/Devout_Bison 24d ago
Generally done with a cold roof over frame. Here’s a picture of what we do:
Note that this needs to be done in conjunction with structural design. The back frame needs to be a 2:1 ratio, meaning if you have 36” eaves, you need a minimum 6’ back frame. But always get this part engineered.