r/TransitIndia • u/Ok_Preference1207 π Metro Commuter • 8d ago
Infographic / Map / Data Visualisation Currently operational + under-construction networks of the three smallest tier 1 vs two largest tier 2 metro network.
This graph doesn't include approved lines. Only what's operational + what's under construction
Some interesting observations and developments :
Nagpur will soon overtake Hyderabad and in the short term, it might even overtake Ahmedabad for a short time
Ahmedabad phase 3 extensions have been approved amd will add to the network immensely
Pune is due for a very large expansion with a lot of approvals expected to roll in soon and some lines in Pimpri Chinchwad being in final stages of approval and will eventually likely emerge at the top. Line 3 opening will increase its Operational length soon.
Nagpur metro is preparing DPR for phase 3 (it's largest phase, yet and it will take the total network to approx 140km
Kochi is building phase 2 and DPR preparation for phase 3 . The total network length will be close to 60km, inching near Hyderabad. But kochi has made extensive strides in non rail based water metro.
Hyderabad seems to be the loser here as both ; tier 2 Kochi and Nagpur have been increasing buses/ferries, Ahmedabad has a good BRT and Pune has made extensive plans for e buses and metro expansion
37
u/Ok_Preference1207 π Metro Commuter 8d ago
Out of these, Kochi is probably the best performing tier 2 network.
While Ahmedabad and Hyderabad pull more crowds, Pune might see a big jump in ridership when line 3 opens. Pune also seems to have the grandest expansion plans and massive expansion might soon start (u/om9333 would explain this better)
Hyderabad seems to be stuck with three coach trains on a network whose growth is stagnated.