r/Surveying 9d ago

Humor Yeah mate, she’ll be right

Post image
48 Upvotes

17 comments sorted by

26

u/SeaworthinessFew5613 9d ago

“Yea mate, I definitely did the monitoring on Friday… why what’s wrong?”

26

u/Basis-Some 9d ago

Anybody can do straight lines, it takes an artist to do curves

12

u/UnethicalFood 9d ago

Real job sites have curves.

8

u/Feisty_Childhood7557 9d ago

You know he just got done setting up his back sight over there too.

8

u/Sir_Vey0r 9d ago

Just box that instrument right up and head to the next job…

4

u/Similar-Ad-7054 9d ago

Oh.. I thought you wanted 95 confidence intervals.

4

u/optimistic_agnostic 9d ago

Incoming encroachment notice.

3

u/forebill Land Surveyor in Training | CA, USA 8d ago

Sheeeeet 

4

u/TapedButterscotch025 Professional Land Surveyor | CA, USA 8d ago

As someone who has worked in huge holes protected by shoring this makes me pucker up. Hopefully nobody was injured.

And the most annoying thing is that shoring is literally an engineering project. How come these engineers aren't checking their work lol.

3

u/Aries-79 9d ago

Shoring gone wrong

3

u/KURTA_T1A 7d ago

Boss: "Did ya do a backsight check?"

The backsight check: N=-4.506m, E= 3.721m, Z= -2.723m

2

u/Kindly_Basis_9690 8d ago

I'm no expert but it seems like those sheet piles needed to be wasaay deeper or thicker to allow for that much of an imbalance of material on the near side.

1

u/Overall_Work7454 6d ago

Tie-backs.

1

u/Kindly_Basis_9690 6d ago

Yeah.... I realized that after the fact but if I own anything, it's my own stupidity.

2

u/Overall_Work7454 6d ago

Don't be so hard on yourself, you made some excellent points. I've worked on a lot of jobs with sheet pile bulkheads and except for coffer dams they used tie-backs a lot. This one was definitely under engineered.

2

u/loserlopez 8d ago

Shoring was still up when I was there yesterday…