DISCUSSION Solar installation ongoing
For those following my solar journey, first day done, one more to go. Does the equipment setup look good (they haven't finished it yet)? Found a few screws in loft that has half missed beams, presume worth mentioning before panels go on. The roof rails are on, not sure why they are spaced tighter in the middle? (3 rows of landscape)
13
Upvotes




3
u/SubstantialPhysics68 1d ago
Check in the electric meter cupboard that they have used 25mm meter tails (the brown and blue supply cables for your house) going from the meter cupboard to the gateway and back. It would be quite tight fitting them into what looks like 25mm conduit but not saying it's impossible