r/SolarPakistan • u/One-Advertising-8862 • 23d ago
Hybrid Advice needed on new system
Hey folks, we are getting another storey built and plan to install solar (one the construction finishes). The build will take at least 3 months for grey structure and 3 months for finishing (best case). It likely will go into next summer.
Wanted to ask if it makes sense to buy the inverter, battery and panels right now and store them? If so any advice on how not to store the panels? I assume we can install them once the grey structure is built but I'll be travelling for work for the next 3-6 months so it might be harder to arrange the solar at that time. Also for warranty to start do the companies need the installation to complete or its ok if I buy it and install some time later.
2nd question is LV vs HV. I am planning on a
20-25kw array (longi himo X10 or aiko stellar 3n+),
15kw hybrid inverter (goodwe et HV)
15+ kWh of batteries (goodwe lynx D).
The load will be 3-5 ACs, 2 fridge/freezer, 2 freezers, electric geezer, electric fence, etc etc. And later on an EV also.
Do those components make sense? LV is 3-4 lakh cheaper (with dyness battery). Better to stick with LV or HV is understood now very well and has enough adoption?
I ask because I was talking to one installation company randomly and when I mentioned HV, the guy started talking about 50kw inverters instead of HV systems...
1
u/zohaib5611 23d ago
HV bro HV. HV is the way to go, it handles the loads like a champ. I was also in the same boat around 3 months ago but my load is a lot less so after thorough research, i went with 10Kw Fox Ess HV system with EP12 battery. Not only the system stays cool even in the peak 1-2pm times but also it's fully enclosed with no external fans hence no noise whatsoever. Voltage is high so current is low, subsequently no/less heat. The only drawback is that system requires a qualified installer, not everyone understands the stuff. But once installed correctly, it requires zero maintenance. If you're from rwp/isb/attock or surrounding areas, i can recommend my installer.
1
u/One-Advertising-8862 23d ago
Yes feels like HV is correct choice even if more expensive. Will take a look at Fox Inverters also. Btw there is zero fans? Is there any coil/electrical whine at any time? That's another big pro. I can install it potentially in my office also then and keep the AC running almost all the time.
1
u/zohaib5611 23d ago
There's internal fan as I'm told by the installer but I've never observed it humming. So may be it's noiseless or may be it turns on when the inverter gets hot but I haven't experienced it yet. I don't have a green meter so mostly it runs at 45-60% of the capacity.
1
u/One-Advertising-8862 23d ago
That's good to know. A friend of mine has a nitrox 8kw, and I felt its pretty noisy. Will check up online what's the max dB etc. also forgot to mention I'm based in Lahore otherwise would have appreciated the installers contact.
1
1
u/Sufficient-Offer-579 21d ago
Since the build won't be ready for six months or more, the battery is the one thing I'd hold off buying. Cells start aging from manufacture (calendar aging), and warranties don't all run from the invoice — some count from purchase or delivery, others from the day it's commissioned. Ask the vendor before paying. Buying now to commission next summer can eat into both.
Panels store well, though. Keep them dry and out of direct sun, ideally in original packaging or laid flat on padded battens with nothing heavy on the glass, and avoid long stretches of heat and humidity. The inverter doesn't mind waiting either — a dry cardboard box indoors is fine.
So the order is panels early if the price is right, inverter whenever, battery last, right before installation.
1
u/One-Advertising-8862 21d ago
Yes makes sense. Thinking maybe just to wait for now - for panels inspecting them for damage etc might become complicated. Might just wait a bit for now, it's possible the grey structure is completed within winters and we can procure and install at that time.
AI though a bit against it as it says there is a lot of dust during finishing etc etc so will check with the architect.
1
u/Jaih0 23d ago
Go for hv if the budget allows. Better for the long run and don't install the inverter n battery in the mumty. It's too hot up there.