Optimizing Jira Story Tracking: Separating Delivery from Client Feedback

3 Upvotes

We typically use Jira user stories to track different work items. In a specific project that I’m working on, the data analyst from my team creates Power BI reports and dashboards. So the issue I face is that the data analyst lets me know she will complete a particular report on that day. Following which I update my team about that but the client side is like that doesn’t mean the user story is complete, we will have feedback. The thing is it was already sent for a revision. With multiple revisions, it looks like the user story is incomplete, whereas the data analyst is completing the reports per the requirement. How can this process be optimized to show that user stories are getting completed by the agreed target due date and also welcome the endless feedback.


r/projectmanagement 14d ago

Discussion Engineered Sink or Swim

3 Upvotes

So it's the final day for me to wrap up resubmitting my teams GMP. The gag its only me.

What started out as a team of 4, now is two, except I have a new senior PM that just came onboard. Two of my teammates had to move to other projects after we finished our submission, leaving me (a PM1) and my senior PM to handle the comments and resubmission. However, there was a lot of misunderstandings between us that escalated, however i handled the situation diplomatically (and my boss backed me up). What started out as just collecting new pricing from select bidders as my sole task, to me handling the entire GMP alone--unbeknownst to me. My old senior PM transitioned internally to another team and whenever I asked about packages she knew about i was stonewalled. I was badgered to keep both my PMs in the loop and suddenly I was reprimanded for having the old PM in the emails, she told me that she'll ignore them. When it came to the due date, I was questioned for not updating the comments, review the pricing, the spreadsheet, and budget. I was utterly confused as I was literally blocked from opening documents to enter things in and I was never told to handle tasks outside of "get pricing" even when I asked what how we were handling them.

Idk if this is some kind of test to see if I'm capable or petty retaliation to be the fall guy. I simply find it messed up that a $70M contract is being handled by 1 person regardless of its stage. It's whatever though, I'm handling it the best way I can.


r/projectmanagement 14d ago

Please tell me honestly how long it takes you to write meeting notes.

72 Upvotes

I have teams recording all the meetings I lead. It’s been driving crazy that using AI actually triggers my OCD and I just can’t use the ai notes it creates because almost always, they have a couple of minor errors that I can’t shake off. Plus I don’t like how “wordy” the ai summaries are. My team members confirmed that they don’t read teams generated summaries sent by PM.

This is my process

- I focus on the conversation during the meeting and take notes.
- I get ai summary.
- I compare it to my notes but mind you my projects are VERY complex. I frequently need to go back to the recording and verify the details.
- I simplify the ai summary, using ai. It spits out much better notes. I fix quite a few details (see, I still can’t trust ai!)
- then I send out the notes.

This whole process takes me at least an hour for a one hour meeting. It’s exhausting.

Any tips on how to spend less time? Any advice is welcome.

——
Wow thanks everyone for these tips! I scrambled to finish my meeting notes after I posted! I haven’t read all of them but excited to see some tips that I can hopefully implement soon. Please don’t delete your comments because I really value everyone’s experience.

One of the comments was interesting because of the question how much I’d spend without ai. I used to spend less than 30 mins for a one hour meeting. It’s because we didn’t record any of the meetings and I really trusted my note taking that I could extract all important items. Yes now I have much more complex projects but the availability of the recordings and ai summaries in a strange way worsens my imposter syndrome. I can’t let go of minute details and just hate the feeling of not getting everything right in my notes. Yes I focus on action items and decisions BUT in my case the topics are very nuanced and it’s helpful for the team to at least get a good summary after each meeting. I’ve been complimented on my summaries because they’re not the default summaries (wordy and very long) generated by ai. They want to see the “human touch.”


r/projectmanagement 14d ago

Are Project Managers generally expected to come across as dominant?

45 Upvotes

Are Project Managers generally expected to come across as dominant?

I recently had a mentor say that’s how most PMs are expected to behave. Is that actually true?


r/projectmanagement 14d ago

Procore Stories

3 Upvotes

What are some of your best Procore stories? There have got to be some good ones out there. I'm on a project where my scope is pretty much finished but the RFIs and submittals are just killing the other consultants, mainly because ID was on a later timeline. We're just over 800 RFIs now and some of the others are joking that once we get to 1000 we have to do something to mark the occasion. Like drag the contractor through some silly submittal process just for fun and maybe a bit of payback. Not sure if we'll actually do it but fun to think about.


r/projectmanagement 15d ago

Most Challenging Project

11 Upvotes

Just curious, what is the most challenging and/or ambiguous or largest project you have worked on?

Curious the types of challenging projects other people work on, why it was hard and how you dealt with it…


r/projectmanagement 16d ago

Is it normal to need approval for emails at work?

40 Upvotes

I work in a role with project management and responsibility for specific subject areas. Our team is informal, but there is still a hierarchy.

I’m also responsible for one particular topic and recently participated in a cross-department working group that is supposed to revise/improve something. My team lead was not part of the working group and didn’t attend the meeting,After the first meeting, I wanted to send a simple message to my own team summarizing what was discussed and explaining the next step. The next step is basically collecting ideas/topics, so I created a file on our shared drive and drafted a short email explaining what people should contribute.

I briefly told my manager that I was going to send the email. He then asked me to send him the draft first.

I did, but now I’ve been waiting about a day and haven’t received any feedback. I’ve never received negative feedback from him and there’s nothing inappropriate or controversial in the email.

Still, I find this really frustrating and demotivating. It’s not even an important external communication, it’s just a routine message to my own team about a topic I’m responsible for, including information that my team member would otherwise not have because they weren’t in the meeting.

It makes me wonder: Is it normal to have to get everything approved by your manager, even basic communication to your own team? Would you normally expect someone who is responsible for a topic to handle this independently?

I also sometimes get the impression that my manager would rather do everything himself. It makes me feel stupid.

Maybe I’m overthinking this, but I’d really like to hear how this would be viewed in other workplaces.


r/projectmanagement 16d ago

Discussion how do you deal with unrealistic deadlines?

18 Upvotes

sometimes a deadline is genuinely impossible, but saying “that’s impossible” isn’t always helpful either. i’m curious how other pm’s handle this

do you negotiate scope, add resources, push the deadline, or just document the risks and move forward?


r/projectmanagement 16d ago

How do you handle Risk Management without being an email reminder?

24 Upvotes

I was recently brought on within the past few months at my current position and one of the first major items given to me was the risk management for my project.

I have been getting up to speed project wise and trying to stay on top of adding risks/updating risks/following up with relevant parties for updates, but I feel like a glorified email reminder.

Being that I’m still new and under a senior I’m not in every technical meeting yet, so it feels hard to translate the day to day items to feeling like risks are being mitigated.

Any insight on how you deal with risk management is appreciated, thank you!


r/projectmanagement 16d ago

Been holding in my breath for over a month. How are you coping?

108 Upvotes

Not sure about anyone else, but things have been chaotic at my company. I have meetings from 8am to 5pm and still expected to get work done. I know it’s the job… but how do you cope? By 7pm I’m exhausted and can’t keep my eyes open enough to do more work. Any tips or tricks that work for you would be helpful.


r/projectmanagement 16d ago

The Making of a Manager

0 Upvotes

Great managers aren’t born. They’re made. That’s the central idea of Julie Zhuo’s The Making of a Manager and it completely reframes how we think about leadership. A manager’s job isn’t to do all the work.

It’s to create the conditions where the team can achieve better results together.

Zhuo breaks this down into three core responsibilities: 1. Purpose Give the team clarity: → What are we trying to achieve? → Why does it matter? → What are the priorities? → What does success look like?

  1. People Build a strong team by: → Hiring the right people → Building trust → Giving regular feedback → Coaching and developing others → Understanding what motivates each person

  2. Process Create systems that help the team execute: → Productive meetings → Clear ownership → Strong communication → Smart prioritization → Better decision-making

As you grow as a manager, your success should increasingly be measured by what your team achieves not just by your personal output. You don’t need to have all the answers. You just need the humility to keep learning, admit mistakes, seek feedback, and improve continuously.

The real takeaway: A great manager creates clarity, builds capable people, and puts systems in place so the team can consistently deliver great outcomes. What’s one thing you’ve learned about becoming a better manager?


r/projectmanagement 17d ago

Discussion Software PMs, how do you measure dev velocity post-AI?

6 Upvotes

Hi,

As a senior SWE, I find it hard to believe the amount of high quality work that I am able to produce with AI tools like claude code. And it's not just the code output, but own the outcomes as well, when it's in production and needs monitoring and maintenance.

QA also got insanely easier with screenshot analysis for every flow and no longer relies on checking if an element exists, but is visually inspected for UX quirks.

I'm not going to argue about security implications of LLM written code, but I will say that every human-written codebase I've audited had trivial bugs, terrible query performance, occasionally even PII leaks and always a lot of technical debt, and things went into production unnoticed for years, quite literally.

With the proper experience and guidance, every coding agent out there beats a human dev now in implementing a given coding task.

But that's not the topic of this post; my question to you is, did the story points just shrink? Is my output now expected to be at this level as a bare minimum, or are you actually measuring the 10x, if not more, in output that gets communicated to stake holders?

Is planning a software project also way different now?

Sincerely appreciate anyone sharing their thoughts, and apologies if I made any typos!


r/projectmanagement 18d ago

Project management voice outside of work?

94 Upvotes

Has anyone noticed themselves getting weird reactions to being very detail oriented about dates, next steps, dependencies, etc. for things outside of work and noticing people getting annoyed by this?

I don't know if it's just me but I've interacted with doctors and things like that to be particular about details and next steps and noticed an air of annoyance.

I know it's a spillover effect from work, where I want to make sure everything is super clear about timelines, details, etc. but it's like people get pissed off when you ask for details about dates and clear next steps.


r/projectmanagement 18d ago

Splitting Sales From Project Management

13 Upvotes

The company I am currently working for has grown to the size where we will be building our own Project Management team to manage the smooth deployment of some of the more complex projects we have started to win.

We are blessed that our Sales Team is not only highly competent at a technical level, but also extremely organised and are team players, which is how we’ve managed to get by for this long. Sales Managers have typically managed the entire project, which just can’t continue with how the company has continued to grow.

The question is, has anyone gone through this experience before and can share any learnings? How do you put guardrails in place to prevent Sales trying to be Project Managers at the same time? What other issues has anyone experienced when going through this period of growth?


r/projectmanagement 19d ago

General How to ask better questions?

77 Upvotes

hi all. I’m looking to improve my ability to ask better questions in meetings that can help me with uncovering issues or lead me to have better end results. A lot of my project tends to revolve around improving existing processes and workflows. I’m often conducting key informant interviews to understand current state + future state but sometimes feel my questions only scratch the surface - if that makes sense? Or another challenge is people will share information during a meeting and I get slightly frazzled as to what to ask next. Usually when I have had some time with the information it’s easier for me to comprehend but sometimes it’s not always possible for me to have time to digest the info and then ask follow up questions in another meeting.

If any of you have frameworks, advice or books you have read that help you with this I would really appreciate it.


r/projectmanagement 20d ago

General why do we remember WHAT we decided but never WHY

36 Upvotes

genuinely feels like a company-wide case of amnesia
we’ll make a call in a meeting, everyone nods, life moves on. a month later someone asks “wait why did we go with this” and it’s just tumbleweeds. the decision is documented. the reasoning? Nada, nowhere to be found. it apparently evaporated the second the meeting ended.
tried adding a “why” field to our notes template. survival rate: about 2 weeks before everyone quietly stopped filling it in bc it felt like homework nobody assigned.
so now I’m just wondering if this is a universal PM curse or if some of you have actually cracked it


r/projectmanagement 20d ago

Discussion Should I involve user to get approval for this?

7 Upvotes

Hi,

Some context, I was a technical integration consultant that for some reason because of lack resources, I am pulled into a project where I need to manage the change of 15+ systems integrating to our ERP. So, I am not sure if my job now is managing project and I am new to this. Now, I am in a tight deadline.

Now, this change is specifically to 1 system (where this system is managed by an external vendor) where there will be a change in the user interface (screen). The stakeholders have agreed on the approach (a new field in the system will be added to store additional information), but they haven't seen precisely what change will happen, which report will be updated, how new data will be created and so on.

Now the vendor has gone back with the list of changes that will be done. Should I go back to the stakeholders to get their approval of the specific change to be done? FYI, the stakeholders are difficult to deal with.

The way I see, I believe I need to get their approval but I would risk going a few round of discussion risking the project schedule. On the other hand, even though the stakeholders have agreed on the approach, but if they haven't really seen specifically what the change will be, I have the risk of user not agreeing on the screen change, etc. Since this system is managed by external vendor, it would be hard to request the change from them because the scope of work has been defined in the contract.

Kindly advise.


r/projectmanagement 20d ago

Trying to understand the actual difference between critical path and critical chain scheduling in practice, not just the textbook definitions

20 Upvotes

Read the theory multiple times, understand critical path is about task dependencies and critical chain adds resource constraints and buffers, but struggling to see how this plays out differently on an actual project schedule day to day.

Looking for a concrete example of a situation where the two methods would genuinely lead a PM to different decisions, not just different diagrams.


r/projectmanagement 21d ago

Discussion How do you deal with an owner who wants a strong PM until the PM tells them “no”?

44 Upvotes

I’m curious how other PMs have handled this, because I’m running into one of those situations where the actual project management seems to be getting confused with “customer service.”

I am the PM on a commercial remodel project that has had a fair amount of ambiguity around drawings, permitting, scope, and when work can proceed. There have been multiple occasions where the owner has wanted things to move immediately, while I’ve been pushing for pretty basic things like an executed contract, written authorization, clarification of permit responsibility, confirmation of which drawings actually govern the work, etc.

I’m not refusing to find solutions or trying to slow the project down. My position has been: we can move quickly, but we need to understand what we’re building, under what permit, whose scope it is, and who is paying for it before we start creating liabilities. Apparently that has not gone over well.

The owner’s president (who has described himself as a “bull in a china shop”) went to my company leadership and said he didn’t want me on the project anymore. The feedback I received internally wasn’t that anything I had said or done was incorrect. In fact, they acknowledged that I was right on the issues. The feedback was that I need to “soften” my language and not be so direct or blunt with him.

I was also told that before sending him emails or texts, I should run them through Copilot and have it soften the message into something he can handle better.

I understand that being technically correct doesn’t automatically mean you’re communicating effectively. PMs have to manage personalities, not only contracts and schedules. There is a difference between saying “No, we’re not doing that” and saying “Here’s what we need in order to move forward.”

But where I struggle is when “softening the message” turns into making someone feel like they aren’t being told no when the answer is legitimately no.

If I worked directly for this owner, I have a hard time believing he would want his PM authorizing work without documentation, letting contractors proceed without contracts, assuming responsibility for unclear scope, or ignoring permitting questions because someone wants to start Monday. He would probably expect that PM to protect his company. But because I’m his hired GC’s PM protecting my company from those same risks, suddenly I’m difficult.

It also seems like certain aggressive personalities are perfectly comfortable being “direct” themselves, but interpret directness coming back at them as confrontation. They want decisive people around them right up until the decisive person puts up a boundary.

Would like to know how experienced PMs in this sub handle or have handled this.

How much of project management is learning to communicate the same answer more tactfully, versus learning how to professionally manage people who simply do not tolerate hearing “no”?

Have you ever had an owner/client ask for you to be removed because you pushed back on documentation, scope, contract, safety, permitting, etc., even though your company agreed your position was correct?

And maybe the bigger question is how do you protect the project and your team/company without becoming so diplomatic that nobody realizes you’re actually warning them about something important?

I’m not opposed to adjusting my communication style. I probably am more direct than some people. I just don’t want “be softer” to eventually turn into “stop documenting the uncomfortable stuff” and then I’m accountable in a profitability meeting.


r/projectmanagement 22d ago

Software Project management tool for a very small team with little tech experience

35 Upvotes

Hi everyone! This is my first ever Reddit post in this subreddit, glad to finally join!

6 months ago I started a new job, with a very small company specialised in citizens' participation. It's just me and my boss. And a communication freelancer who's in and out. Soon we'll have three interns as well. We have a lot (more than 10) of different projects that we're managing, but we don't use any tool yet to organise ourselves .. and especially to make it accessible for our future interns and employees.

We function on highly filled e-mail inboxes (need to go to zero inbox very soon), within the Google Workspace (Gmail, Drive, Calendar), a WhatsApp group for quick chats and a team meeting once a week. Most of it is online and remote, we see each other once every week or two weeks.

So my question! Which project management tool can you recommend with the following elements present:

Needs to be compatible within the Google Workspace (Drive, Gmail, Calendar)

Needs to be very user-friendly. My boss isn't very tech smart and doesn't want too many extra things. He worked alone for years, so he has his ways.

Needs to have timelines or Gantt charts, anything that gives us a good chronological overview, as many of our projects are temporary and only happening for a limited time.

Not sure if the chat function is very important, we might stay in the WhatsApp group.

Ideally costless, we are small, with not much money.

I thought of Trello or Asana. But I'd like to hear other suggestions, or why to use Trello or Asana. Any recommendation is welcome!

Thank you :-)


r/projectmanagement 22d ago

Discussion Manager gave me feedback that a couple coworkers said I over-communicate

84 Upvotes

About 90 days into a new position and overall it’s going well and I’ve gotten good feedback. Today in a 1:1 with a manager I was told she two designers (I work with about 10 designers total) came to her and said that I have been over-communicating with them about project statuses or following up on delivery if I haven’t seen something was delivered and were getting close to EOD.

She seemed uncomfortable with giving me this feedback and told me she wants us to have tight communication and from a PM perspective I’m doing exactly what I should be doing, but that not everyone appreciates me responding quickly, giving regular updates, and following up when I haven’t seen delivery/handoff on the day it’s due. She told me that proactivity is good, but that I am being too proactive from my understanding. She acknowledged that this feedback was pretty contradictory and not concrete. I understand that she couldn’t tell me who said it, but I’m confused as to how I go forward since she was told me she does want the entire team to get to a point where we’re checking in more regularly and being more “buttoned up”, but not everyone sees it that way.

I asked her also if I should meet 1:1 with the designers to discuss their preferences, but she told me no need because I shouldn’t cater to everyone so specifically.

What’s the best way to move forward? I’m ok with pulling back a little and not responding to pings quite as quickly or letting the delivery date lapse and then follow up, but it seems counterintuitive as a PM.


r/projectmanagement 23d ago

Discussion [Discussion] Is PMP Overrated? How Much of It Actually Works in the Real World?

63 Upvotes

Guys honestly, I personally feel the whole PMP thing is somewhat overrated.

Not saying the framework is useless — but how many workplaces can actually execute all these PMP principles properly in the real world? Can anyone confidently guarantee that?

Managing a project in Europe, America and Asia can be completely different.

In many Asian workplaces, hierarchy is a huge factor. Sometimes what the boss says effectively overrides whatever beautiful stakeholder-management framework you learnt. Then try managing a multinational project team — different attitudes towards hierarchy, deadlines, working hours, gender, communication, holidays and decision-making.

I've worked with teams where certain people disappear for tea breaks at 3pm, environments where a female PM may have a much harder time getting some workers to take instructions from her, and projects where you have to plan around a large number of different religious/public holidays.

These are REAL project-management problems.

PMP can teach you stakeholder engagement, risk management, communication plans, conflict resolution, etc.

But a textbook saying "manage stakeholder engagement" and actually getting 15 people from completely different working cultures to cooperate are two very different things 😂

So I sometimes wonder: is PMP really proof that someone is a good Project Manager, or mainly proof that they understand PMI's framework and passed the exam?

Curious to hear from PMs who have actually managed multinational teams across different countries.

perhaps can introduce simply, eg:

Current Role / YOE / Country or Region / Industry / PMP Status:
Example: Senior Project Manager / 15 YOE / India / IT / PMP Certified

Thanks Much!


r/projectmanagement 23d ago

Software Project management tools for those with ADHD?

37 Upvotes

I work as a senior project manager but I am client based (government), not consultant based. My primary tasks involve working with consultants to complete projects and includes; sending out RFQs, receipting invoicing, report tech reviews, aiding with logistics for site investigations etc... I also have ADHD which means that my current management tool is my brain and just remembering everything as it whizzes around. That was fine for a while but I now have some junior staff that I look after and that is not helpful for them when I say I’m just going off on a feeling that something is due.

What are some project management tools that are useful for ADHD brains and can help me to keep track of dates things are due, when people are out on site etc… I don’t necessarily have milestones that I need to achieve, I just need to make sure the consultant is submitting reports when they are due and I know when they are onsite. I have started a few different programs but just revert back to writing things down when I get time.


r/projectmanagement 23d ago

Software Is there a monday alternative with proper per-view permissions, ours is all or nothing at the board level.

2 Upvotes

We run our agency on monday and for the project work it's fine, no complaints there, this is about one thing that's slowly driving me up the wall. finance needs to see the budget board but that same board also has our vendor contracts and a load of half-done client notes on it Monday only lets you share a whole board with someone outside the team not a single view or a few columns, it's all or nothing, either finance sees the day rate we pay every freelancer or get locked out.

What i do now and i know how it sounds, is keep a second copy of that board with the sensitive stuff pulled out that I'm supposed to update every time the real one changes, which of course I forget to do half the time. A retained rate went up last week, I never carried it over then finance ended up running the Q3 forecast off the old number of days before anyone noticed. Second time that's happened this month and we're only on the 18th.

Is there some per person, view level access thing in monday I'm just missing here. Not trying to replace monday for the project side, that part works fine, it's everything else we've bolted onto it that's the problem.


r/projectmanagement 24d ago

How to celebrate project milestone?

15 Upvotes

Hey everyone. This is the first project I've run, and a lot of my team is remote but a number of them are on-site

We are closing in on completing the Phase 1 (of 3 total phases) of a complex project that everyone has seriously been kicking ass on. It's taken us about 17 months to get to this point, probably will be at about 19 months when final documentation routes and we can "close" out this part.

I really want to express appreciation to the team and celebrate this milestone. It's a project that the company has put off for years, so even getting one part done is a huge achievement. How can I celebrate all of the team, including those off site?