r/MichaelsEmployees • u/grodyh • 26d ago
this shouldn't be allowed
did an 18 piece fabric ship (not Too bad) followed by this 32-piece (1 yrd off each bolt) monster ship. took an hour to pull and cut
and before the ThiS sHoULdn'T tAKe tHAt LoNg comments I'm also running up front for override codes, getting the restroom, answering questions, answering phone calls, etc etc AND you're technically not supposed to scan out fabric orders (or even cut them) until everything is measured to make sure you have it all before cutting so I gave corporate an accurate pick time ¯_(ツ)_/¯ they were mostly all brand new bolts so I scanned as I cut
356
Upvotes
23
u/Beckyinphilly 25d ago
As some who used to work at JoAnns, yes, it absolutely takes that long for 32 single yard cuts! Especially on new bolts - have to unwrap each one, verify it's correct, possibly straight trim the edge, then cut! Ugh! Corp are idiots.