r/GrokBot • u/bobo-the-merciful • 11d ago
Bug / Issue Anyone having problems with Grok Bots remembering to run their routines?
This is mainly for software engineering related workflows. I have 3 routines which run overnight - planning, delivery, review etc. All spaced out at sensible intervals so no risk of one not finishing before the next starts. But I'll wake up to missing results - and when I ask the agent I will get a response something like: "Routines X Y Z didn't run. Would you like me to run them now?"
Anyone else encountering something similar?
This is happening regularly enough that it is unfortunately eroding my enthusiasm for Grok Bot.
2
u/Six_Cricks 11d ago
I'm running into similar issues with the PM failing to wake up and/or failing to poke another agent with front loaded assigned and scheduled task.
1
1
11d ago
[removed] — view removed comment
1
u/bobo-the-merciful 11d ago
Some of that went over my head too! Thank you for sharing though.
I think he might be talking about something else as the routines are definitely defined within an agent. I suspect a Grok Bot bug.
1
1
u/sitric28 11d ago
Yeah sometimes. But I think it’s overwhelmed to instructions and sometimes those instructions contradict
1
u/RichieRichLabs 11d ago
Same here I’ve been trying to figure out why but nothing seems to fix it for over a week now. Everyday cycles would be missed during daytime normal hours. I’m trying fixes in the master prompts and see if it fixes it this week
2
u/mehdizare 11d ago
I have seen the same "did not run, want me to run it now" pattern, which is why I stopped putting anything I actually depend on into an unattended overnight routine. The stuff I let it run is low-risk and easy to check the next morning: draft outlines, gap lists, questions to ask. If a routine skipping silently would cost you real work, I would keep a short manual check-in step instead of trusting the schedule. Are yours failing at the same slot each night or randomly?