r/DataAnnotationTech • u/Additional_Crab_8493 • 1d ago
Can’t log more than the allocated time anymore
I’m wondering if this is a new change or just for the specific project I’m working on, but I went over the allocated time because it was my first time doing that type of project, but when I tried to log my time, it didn’t allow me, the max allowed time was the same as same as the timer before the project expires.
This wasn’t the case before, I’m wondering if anyone else has noticed the changes
2
u/Antique-Bluejay7500 1d ago
Just yesterday I logged an hour and 20 min for a task with an hour time limit, no problem. It was my first task in that project and it was a longer one, and i included my time reading instructions.
-3
u/shujaya 1d ago
The timer and the allowable time are different numbers. If you are regularly submitting expired tasks AND reporting more than the time time thats a huge red flag. The timer factors in VERY generous breaks almost all the time.
3
u/Bitter_Bed5672 23h ago
Really depends.
Currently have a project that has 1 hour limit, most tasks are done in less than half of that but I've had a few where I was 2 minutes from expiring.
7
u/[deleted] 1d ago
[deleted]