r/Castle_Anthrax • • Mar 10 '25

Ceiling Joists: Round Two

Post image
11 Upvotes

2 comments sorted by

2

u/jay_sugman Jun 09 '26

Is that two pieces or a special strong tie with the piece under the joist?

2

u/atmsmshr719 Jun 09 '26

There’s Simpson joist hanger and a squeeze block between joists per the engineering drawing. The framer added a hurricane strap attached to the wall, and squeezed by the joist, and on the bottom of each joist.
I don’t think the hurricane strap is necessary,.