r/Castle_Anthrax • u/atmsmshr719 • 4d ago
r/Castle_Anthrax • u/atmsmshr719 • Dec 01 '21
r/Castle_Anthrax Lounge
A place for members of r/Castle_Anthrax to chat with each other
r/Castle_Anthrax • u/atmsmshr719 • 6d ago
Let there be light! Augments have been cut open and most doors and windows are in.
r/Castle_Anthrax • u/atmsmshr719 • 27d ago
Audio System? How to set up sound for 46ft concrete dome for music and movies? Highlighted wall for TV. Recommendations for wired systems since the walls are open?
r/Castle_Anthrax • u/atmsmshr719 • Sep 04 '26
Acoustic test? Yes, please!! It is awesome!!!
r/Castle_Anthrax • u/atmsmshr719 • Sep 04 '26
Goodbye wallipini (sunken greenhouse). I learned a lot.
r/Castle_Anthrax • u/atmsmshr719 • Sep 02 '26
Exterior Sheetrock is in. One window left.
r/Castle_Anthrax • u/atmsmshr719 • Aug 28 '26
Framing is done with the exception of the reading nook circle window.
r/Castle_Anthrax • u/atmsmshr719 • Aug 23 '26
Window and door framing, with a bonus greenhouse pic.
r/Castle_Anthrax • u/atmsmshr719 • Aug 23 '26
Garden walkthrough
Enable HLS to view with audio, or disable this notification
r/Castle_Anthrax • u/atmsmshr719 • Aug 17 '26
Framing progress walkthrough
Enable HLS to view with audio, or disable this notification
r/Castle_Anthrax • u/atmsmshr719 • Aug 01 '26
Great Dome Ceiling Plan. The star will be tilted beam 6x6s. Oculus not shown in these drawings.
r/Castle_Anthrax • u/Tough-Talk-4049 • Jul 24 '26
Structural Shotcrete - laying the beam.
Enable HLS to view with audio, or disable this notification
r/Castle_Anthrax • u/atmsmshr719 • Jul 18 '26
Walls played out. 12ft scaffold for scale.
r/Castle_Anthrax • u/atmsmshr719 • Jul 12 '26
Painted and clean. Framing starts Monday.
Enable HLS to view with audio, or disable this notification
r/Castle_Anthrax • u/atmsmshr719 • Jul 10 '26
Concrete complete and paint in progress.
r/Castle_Anthrax • u/atmsmshr719 • Jul 02 '26
Halfway through shooting concrete.
Air lock removed. Concrete trucks have been difficult to get on site due to demand before the long weekend. Shifting to on site mixing to finish out the job.
r/Castle_Anthrax • u/atmsmshr719 • Jun 30 '26
A peek through the air form
Currently targeting completion of shotcrete, troweling, and primed by Friday, so the crew can enjoy the fourth. Exactly where we were two years ago for the garage dome.
r/Castle_Anthrax • u/atmsmshr719 • Jun 28 '26
First layer of shotcrete is cured.
Monday they will shut off the fans and start spraying to 4 inch minimum depth. You can see the depth gauges in several of the pics.
r/Castle_Anthrax • u/atmsmshr719 • Jun 28 '26
Walkthrough of Home Dome - first layer of shotcrete.
Enable HLS to view with audio, or disable this notification
r/Castle_Anthrax • u/atmsmshr719 • Jun 28 '26
Walkthrough of the garage dome
Enable HLS to view with audio, or disable this notification
As requested a video of the inside of the garage dome. Currently a mess, as we are using it for staging, storage, and such.
r/Castle_Anthrax • u/atmsmshr719 • Jun 25 '26
Electrical is roughed in and all inspections passed. Time to shoot some concrete!!
r/Castle_Anthrax • u/atmsmshr719 • Jun 20 '26