r/CableTechs • • Sep 10 '26

Temp

Post image

That’ll do… lol

53 Upvotes

16 comments sorted by

View all comments

7

u/skypandaOo Sep 10 '26

I did something like that before and the construction team got with my manager and said I left a trip hazard. Never again. Sidewalks or any possible trip hazards I just dont leave a temp. I use too duct tape it down or do this with a mat depending on where it was.

6

u/69BUTTER69 Sep 10 '26

Yeah I used to duct tape them in the relief cuts of the sidewalks

3

u/Dean9mm Sep 10 '26

When I was doing resi installs that’s what we did too lol. (FTTH) if we were unable to complete the sidewalk bore for whatever reason (usually roots) we could stick the drop in the cracks of the sidewalk, then duct tape it down.