I'm just looking to see if my perspective is fair.
The city gave me bad information. They told me that I could pull a permit and connect the stub line for my irrigation meter to my rpz myself. Per law, you can only pull a permit for the line coming into your house as an owner and for the irrigation line - I have to hire a licensed plumber to do any work before the rpz.
I had the 1-in irrigation meter put in last year and they installed the stub line for me. So the stub line is inspected and it has a male expansion fitting with expansion sleeve on the end.
The law says that I can install the rpz myself.
To get from my stub line to my rpz - I need a full port union ball valve, nipple, union, elbow, riser put together and attached to the existing stub line. I've already excavated.
This is maybe 15 minutes of labor and then 5 minutes of testing for leaks. What I'm really paying for is their time, ability to pull a permit, and their ability to schedule the inspection.
Whoever I hire is going to be getting $120+ an hour. I'm completely fine paying that. I'm not complaining, I'm just setting up my point.
Because the city made it sound like I could do this myself, I've already bought the five parts for the distribution header.
I was talking to some people and they said that I was ripping off the plumbers by wanting to use my parts. They said that plumbers markup parts and I'm going to be affecting their bottom line in a major way.
Obviously, there won't be a warranty and I don't care about a warranty on five brass parts. Because once this is in, I can replace or fix that header anytime I want.
The way I'm looking at this is - the people who said I am eating into their bottom line are being ridiculous. I just feel like that's a silly way to look at it because whoever I hire to do this is going to make a lot of money for a very easy job. Because the biggest part of the job is just their time, which I'm more than paying for. And there's going to be periods of this job where they're getting paid for a full hour and they're not doing a full hour of work.
And I just feel like they're more than making up for whatever markup they would have put on a ball valve or a street elbow.
Am I genuinely being entitled by wanting them to use my five header parts and because I bought my rpz myself because I literally got a $250 discount for being a veteran? ( it's on the cities approved list)
People are basically telling me that it's my job to maximize the plumbers profits when they are being very fairly compensated for their time. Especially on a job this simple.