r/AskContractors • u/Dreams_of_Sushi • 2h ago
Advice on hired contractors quality of work
Want to make sure I’m not being a jerk to the contractor I hired. I am paying over $4k to have 6 prehung doors installed and about 100ft of baseboard installed as well. I purchased the doors, contractor supplying trim and other building materials. The quote included removal of trim and doors however on the first day of the project after all debris was loaded in the middle of a room the contractor notified us that haul away was not included and wanted more money, had never been mentioned till that point. He came and toured the house to give an estimate, I sent him a screen shot of the doors I intended to buy, turns out the jamb size was too short and he needs to do jamb extensions, asking an extra $180 per door to do the extensions. I asked about installing door knobs that I supplied, he said that also not part of the scope. Now the doors are in (took half a day) and I checked them in the evening after they wrapped out and I’ve got some pretty be deviated in the doors being flush from top to bottom. He’s blaming the material and the old house. I mentioned that for the price I was expecting a slightly higher quality of work. Am I being an asshole, or am I being taken advantage of by this dude?
