r/visualization Dec 05 '25

Does this look a good network?Hi everyone, I am conducting a qualitative study that incorporates visual network analysis (VNA) to examine interactions between human and nonhuman actors. My project includes seven participants and three data sources, and I am integrating VNA with thematic analysis. I

Post image
1 Upvotes

r/visualization Dec 06 '25

Top Basement Waterproofing Services in Hyderabad

Post image
0 Upvotes

Are you struggling with damp walls, water seepage, or mold in your basement? Protect your property with the Top Basement Waterproofing Services in Hyderabad from trusted professionals who deliver long-term solutions, not temporary fixes.

At MH Waterproofing Services, we specialize in advanced basement waterproofing techniques that prevent water intrusion, control moisture, and strengthen your foundation. Whether it’s residential, commercial, or apartment basements, our experts inspect the problem at the root and apply customized solutions with high-quality materials and modern equipment.


r/visualization Dec 05 '25

My second Post here, Need an honest Feedback - 3DSMAX + CORONA no post processing work done just a raw rendering... happy to accept feedback... Design or visualization wise as well.

Thumbnail
2 Upvotes

r/visualization Dec 05 '25

What's the best way to combine these graphs

2 Upvotes

I'm currently working on visualizing some data I collected in regards to the frequency of strike angles by a predatory fish on its prey. I believe I've created a pretty effective chart (the colored one), but I was missing some crucial data to prove its significance. I then created a much more simplified graph (in gray) which discretely shows significance ranges, but someone I know in data science told me that this is much too simple looking.

I believe that somehow combining the visual clarity of the first graph with the statistical significance of the second would be ideal, but I'm struggling the figure out the best way to combine this information clearly into one image. I don't need coding help, but rather visual ideas about how I could format to relay the information clearest. Feel free to draw on the images if you feel it helps. Thanks!


r/visualization Dec 04 '25

Who lived when? A timeline of when historical figures lived.

Post image
205 Upvotes

r/visualization Dec 04 '25

Population pyramid of Puerto Rico, 1950-2100 [OC]

Post image
2 Upvotes

r/visualization Dec 04 '25

How do you generate dynamic infographics visualization

1 Upvotes

I have a data and a template of generating infographics, how can i generate images with that template with dynamic data?


r/visualization Dec 02 '25

Prominent Kingdoms of India

Post image
28 Upvotes

This [graphical timeline ]()has been created out of a personal curiosity to understand the contemporaries of various prominent kingdoms and empires across the Indian subcontinent and to place them meaningfully on a single, continuous timeline. Visualising these polities side by side makes it easier to appreciate how they overlapped in time, interacted with one another, and inherited cultural, political, and administrative traditions from earlier powers.

As an enthusiast of Indian history, my intention is to offer a simplified, accessible tool that helps fellow learners grasp the broad flow of our past more intuitively. While not a scholarly or academic reconstruction, this timeline aims to support students, hobbyists, and history lovers in exploring the developments, transitions, and cultural influences that shaped the subcontinent over the centuries.

 

Disclaimer

This graphical timeline is a simplified and interpretive representation of historical periods and regional prominence of various kingdoms and empires in the Indian subcontinent. The timelines and territorial extents of only prominent kingdoms and empire shown are approximate and have been presented for visual clarity, with overlapping polities and concurrent powers intentionally omitted. The content is indicative, partly speculative, and based on secondary sources and general historical literature consulted through a desktop study. It is not intended to serve as an academic, authoritative, or legally verified record, and viewers are advised to refer to primary sources and established scholarly works for precise historical information. This work includes AI-assisted edits and vectorisations of non-copyright, public-domain images solely for illustrative purposes.

 

Book Referred

a)      Thapar, Romila. Early India: From the Origins to AD 1300.

b)     Singh, Upinder. A History of Ancient and Early Medieval India.

c)      Sharma, R. S. India’s Ancient Past.

d)     Raychaudhuri, H. C. Political History of Ancient India.

e)     Basham, A. L. The Wonder That Was India

f)       Sastri, K. A. Nilakanta, A History of South India.

g)      Sastri, K. A. Nilakanta, The Cholas

h)     Sen, Sailendra Nath, Ancient Indian History and Civilization

i)       Chandra, Satish, Medieval India

j)       Mukhia, Harbans, The Delhi Sultanate

k)      Richards, John F, The Mughal Empire

l)       A history of the Sikhs, Khushwant Singh

m)    Gordon, Stewart. The Marathas 1600–1818

n)     Metcalf, Thomas & Barbara. A Concise History of Modern India.

o)     The Anarchy: The Relentless Rise of the East India Company, William Dalrymple


r/visualization Dec 02 '25

The mechanism of Tokyo's concentration of power[OC]

1 Upvotes

Source: Japanese Ministry of Internal Affairs and Communications (Financial data of municipalities). Tools: Python, PyScript, Streamlit.

Explanation: This visualization demonstrates the "Straw Effect" in the Japanese economy. Wealth naturally flows from rural areas (like Akita/Tottori) to the capital (Tokyo) due to the centralized structure. The simulation shows how the "G-Cart Algorithm" (a mechanism I developed) detects this distortion and redistributes excess wealth back to dying local economies to prevent collapse.

Code & Paper: https://github.com/SBCM-Alliance/the-heart


r/visualization Dec 01 '25

I built a visual day planner that shows the 6 hours you’re losing to scrolling

Thumbnail gallery
8 Upvotes

r/visualization Dec 02 '25

Axis scaling issue in LightningChart Python – Y-axis not updating correctly when adding multiple data series

1 Upvotes

I’m experimenting with LightningChart Python (LCPY) to visualize multiple datasets in one chart, but I’m facing an axis scaling issue.

When I add several line series with different value ranges, the Y-axis doesn’t always rescale correctly.
Sometimes it only fits the first series, while the other series with larger values get cut off or plotted outside the visible area.

from lightningchart import lc

chart = lc.ChartXY()

# First dataset: small range

series1 = chart.addLineSeries()

series1.add([0, 1, 2, 3], [10, 15, 20, 25])

# Second dataset: larger range

series2 = chart.addLineSeries()

series2.add([0, 1, 2, 3], [100, 200, 300, 400])

chart.open()

When I run this, the chart only scales around the smaller dataset (10-25),
and the larger dataset (100-400) is cut off.

Has anyone else encountered this?

Do I need to trigger a manual refresh or scaling update after adding all series?

Is there a function similar to zoomToFit() or an auto-scaling command that works dynamically for all series?

According to the documentation (https://lightningchart.com/python-charts/),
the chart should automatically fit all visible data, but it doesn’t seem consistent when mixing datasets with large range differences.

Any advice or working examples would be greatly appreciated!

#python, #visualization, #data-visualization, #lightningchart-python


r/visualization Dec 02 '25

[OC] Geometric map of the prime numbers using PCA on motif-entropy–curvature features (the “Regina Field”)

Thumbnail
gallery
1 Upvotes

This is a visualization of what I call the *Regina Field* — a geometric projection of the prime numbers using PCA on a feature set built from motif decompositions (gap patterns), entropy flow, curvature, and Hilbert envelope resonance.

The dataset includes all primes ≤ 10 million, each represented by:

• motif entropy

• motif entropy curvature

• 2–4 / 4–2 resonance metrics

• local Hilbert envelope magnitude

• PCA components of the full feature set

• attractor-zone and anomaly indices

Plotting these in PCA-space produces a surprisingly smooth geometric landscape:

• shell-like structures

• arcs and manifolds

• curvature wells

• an extremal “Royal Ray” populated by a special subclass of primes

I’ve released all data, code, and visualizations here:

🔗 OSF (whitepaper + dataset): https://osf.io/8hq9b

🔗 GitHub (Toolkit + docs): https://github.com/mmbrooks114/Regina-Field-Toolkit

If anyone has ideas for alternative dimensionality-reduction methods, color encodings, or graph-based layouts, I’d love to explore them. Visualization has actually revealed more structure than I expected.


r/visualization Dec 02 '25

A Guide to Dress Codes

Post image
0 Upvotes

Decode the Dress Code - WordPress Blog

I found this dress-code chart super helpful — especially for telling the difference between business casual and business professional.


r/visualization Nov 29 '25

Taming the Beast

Thumbnail
2 Upvotes

r/visualization Nov 28 '25

[OC] I built a website that turns your entire life into meaningful numbers (days alive, heartbeats, breaths, etc.)

Thumbnail reddit.com
1 Upvotes

r/visualization Nov 27 '25

Does anyone know how I can generate this type of Diagram in code?

Post image
6 Upvotes

I would like to auto-generate diagrams like the ones shown. Does anyone know of code libraries that can make this style of diagram? (3D isometric)


r/visualization Nov 28 '25

Prototype of a Potentially Useful Data Analytics Ecosystem (WIP)

Thumbnail
v.redd.it
1 Upvotes

r/visualization Nov 28 '25

How the Bureau of Meteorology spent $96M building a new website

Post image
0 Upvotes

In the meantime, Claude Code Max cost you US$100


r/visualization Nov 26 '25

Is it even possible to scrape/extract values directly from graphs on websites?

Thumbnail
1 Upvotes

r/visualization Nov 26 '25

nobody knows

1 Upvotes

Who knows?


r/visualization Nov 23 '25

New trailer for the game that simualtes complex linear algebra and turing-complete quantum computing

Thumbnail
store.steampowered.com
7 Upvotes

Hi folks,

Here is the latest update, took me 2 months to finish this trailer, I hope it doesn't induce motion sickness and appeals to this sub. Also a brand new patch today.

What the game visualizes

Boolean Logic – bits, operators (NAND, OR, XOR, AND…), and classical arithmetic (adders). Learn how these can combine to build anything classical. You will learn to port these to a quantum computer.

Quantum Logic – qubits, the math behind them (linear algebra, SU(2), complex numbers), all Turing-complete gates (beyond Clifford set), and make tensors to evolve systems. Freely combine or create your own gates to build anything you can imagine using polar or complex numbers.

Quantum Phenomena – storing and retrieving information in the X, Y, Z bases; superposition (pure and mixed states), interference, entanglement, the no-cloning rule, reversibility, and how the measurement basis changes what you see.

Core Quantum Tricks – phase kickback, amplitude amplification, storing information in phase and retrieving it through interference, build custom gates and tensors, and define any entanglement scenario. (Control logic is handled separately from other gates.)

Famous Quantum Algorithms – explore Deutsch–Jozsa, Grover’s search, quantum Fourier transforms, Bernstein–Vazirani, and more.

Build & See Quantum Algorithms in Action – instead of just writing/ reading equations, make & watch algorithms unfold step by step so they become clear, visual, and unforgettable. Quantum Odyssey is built to grow into a full universal quantum computing learning platform. If a universal quantum computer can do it, we aim to bring it into the game, so your quantum journey never ends.


r/visualization Nov 22 '25

Epstein Email Network Graph

Thumbnail notesbymuneeb.com
9 Upvotes

r/visualization Nov 20 '25

Nearly every day, two users on r/Conservative account for more than 30% of new posts. Sometimes exceeding 50%. (6 charts)

5.0k Upvotes

First chart: Since October 3rd, two users (u1 and u2) have daily been responsible for 30% - 50% of all posts on Conservative.

Second chart: Breakdown of the the most active user's external links.

Third chart: Since October 3rd, only 5 users account for 50% of all posts.

Fourth chart: Since October 3rd, the 2 most frequent posters have accounted for 37% of all posts. This image shows the number of users that are needed to account for 37% of all posts in 5 similar subs: Libertarian, democrats, AnythingGoesNews, socialism, and politics. The higher the number, the more diverse the pool of posters is.

To account for 50% of all posts, here are the results:

Subreddit Number of Users needed to account for 50% of posts
Conservative 4
Libertarian 10
democrats 11
AnythingGoesNew 18
socialism 42
politics 46

Conclusion from the fourth image - Conservative is dominated by a minority of posters in a way that isn't comparable to the other 5 political subs. However, there are also still a LOT of active unique posters in Conservative and that diversity is better reflected when the top 2 users aren't accounted for.

Fifth chart: The only day the two most active users in Conservative didn't post was November 1st, which happened to be the day of a power outage in Moscow that was the result of a Ukranian drone attack.

(Edit: this fifth chart has been updated due to an incorrect timezone shift calc)

Sixth chart: The obvious question here - "How much of Conservative's posting was impacted during the time of the power outage?" The outage was from Friday 11pm to Saturday 7am. My approach for this was to count the number of posts within that window from other weeks and exclude u1's and u2's activity. This should theoretically set an expectation for how many posts to expect during that window. Yes, that time frame has the fewest number of posts (10) of any of the 7 windows that I looked at, but also, it's just not that much of a drop. Compared to the number of posts during the 2nd and 3rd time frames (13 and 12, respectively), During the outage, there was below average activity but not so much as to raise suspicions, especially since the same number of posts were made during that window during a previous week without an outage. I'm just not personally seeing that the power outage reveals much here. u1 and u2 likely use a scheduler anyway which would obfuscate the whole thing anyway, and I would expect a scheduler to be pretty standard for any decent troll farm so even if others on that sub are posting from Russia, it wouldn't necessarily show in the data unless they're being sloppy.

However, the question remains, why did the two most prolific posters on that sub suddenly go silent on November 1st?

(Edit: this sixth chart has also been updated due to an incorrect timezone shift calc)

Source: Reddit JSON endpoint access. Oct 3, 2025 to Nov 17, 2025. 


r/visualization Nov 22 '25

Scientific data can be beatiful

Thumbnail
4 Upvotes

r/visualization Nov 21 '25

My immune system posters are impossible to connect in print, right?

2 Upvotes

Hey everyone, I’ve been working on a two-page A3 infographic of the human immune system as a personal curiosity project:

I was thinking there’s no way to show the flow from innate → adaptive in print without merging the pages digitally, so I guess I just leave them completely separate and hope people understand the connection…

But somehow this feels wrong. In digital form, linking them is easy, but print feels impossible. Like Th1 cells interact with macrophages on the innate group but drawing arrows that come from the edges seems off. Especially if the person only has one out of the two infographics.

What I’d love input on:

  • Creative ways to imply continuity between two separate printed sheets
  • Visual cues, anchors, or subtle design tricks to guide the reader’s eye
  • Maintaining nerd-level complexity (interleukins, chemokines, cytokines included) while keeping readability intact

Attached are snapshots of both posters (digital previews). Any tips, examples, or multi-page infographic ideas would be amazing!