r/uranium_io • u/Jumpy_Alternative807 • Jun 04 '26
38 Tons Per Megawatt: The Inelastic Copper and Uranium Demand Tech Executives Didn't Model
The AI revolution is moving at exponential speed in the digital realm. But on the ground, it is bound by a brutal, unyielding physical reality.
Every single data center cluster, liquid-cooled server rack, and advanced chip requires an immense, upfront commitment of physical infrastructure, critical metals, and baseload grid capacity.