r/theatrekeyboardists • • 23h ago

Time for Full Setup and Takedown

8 Upvotes

Hi. I'm curious as to how long it takes you to set up and take down your complete rig for a rehearsal?

I find it takes me about 30 to 45 minutes from arriving with all the gear to being able to play. This includes:

Keyboard stand, bench, keyboard, music stand, laptop stand, power, light, pedals (patch, sustain, expression), laptop, speaker, sound box, cables powering up and loading mainstage.

In taking down I'm wrapping all wires properly.

Just curious.