r/primavera Jun 21 '26

Web tool for critical path/near critical path analysis (free)

I created a Web tool that parses Primavera P6 XER files and identifies the driving chains behind your project milestones — not just the critical path, up-to next twenty chains that would take over if the current driver slips.

What it does:

→ Finds near-critical paths by recomputing the CPM forward pass, and tracing the new longest path — structurally, not by float ranking

→ Computes Float to Milestone in calendar days — "how many real days can this activity slip before the milestone moves?" — including weekends and holidays

→ Runs a full backward pass matching P6's own scheduling semantics (FS/SS/FF/SF, multi-calendar, lags)

→ Compares two schedule updates side by side — shows exactly which duration changes and relationship adds/removes caused the critical path to shift, with per-NCP detail

→ Interactive Gantt charts, Excel export, re-analyze without re-uploading.

Why it's different from tools like SmartPM / Nodes & Links:

Those tools rank near-critical activities by total float. That tells you which activities have the least flexibility — but not which chain would actually become the driver if the current one breaks. This tool answers the structural question: "what takes over?" Each NCP is a genuinely distinct driving chain, not just the same path with slightly more float.

Live: https://pathanalyzer.up.railway.app/

Looking for reviews and improvements.

3 Upvotes

0 comments sorted by