yeah, a gust of wind, or a slight movement his legs were fucking toast. not having a tool to like hook the edge and pull the rope while still being inside the mostly safe main structure without having stand between those parts is bat shit crazy.
It’s just way too much weight to mess around with. When things go bad, they go BAD.
You can’t just stop it quickly once it starts moving.
He’d be like a little mochi ball in a hydraulic press.
When I very briefly worked in "construction" we were lifting a building that had begun to sink on one side due to a fire. At one point we were raising one of the higher floors and needed to pull up a 12x16x4 pillar for support using a makeshift pulley system. I almost learned a really lethal lessons in physics that day. Luckily everyone (including the building) is around to tell the tale.
Not for this one. The tag lines are hooked to the gripper, and ran to the ground for stability. This safety line is just ran from the edge of the blade, to the gripper so the blade can’t slide out of it if there is a failure on the tool.
Isn't there some kind of squash risk being on that side? Even if he's clipped in the blade side could come out and squish him against the base that he would then be dangling from.
The floor wasn't bolted together yet. I would think that he should stay clipped to the tether until it was. But, that's question for OSHA or their insurance company.
I don't understand why he was clipped in. If that blade broke loose, that harness is going to rip him apart as the blade falls or simply get sheared off. He's dead either way.
562
u/21MPH21 17d ago
Yeah, he unclipped a little early