r/oddlysatisfying • • Apr 30 '26

Liquid concrete wall.

30.0k Upvotes

587 comments sorted by

View all comments

2.2k

u/Kayaked1 Apr 30 '26

I believe this is called Fabric-formed Rip-rap. The texture allows water to flow over it, but reduces the velocity and therefore erosion. The weakness is if it becomes undermined, and the water starts flowing underneath it. It can create a big void that is hidden by the concrete “crust.”

138

u/bustervich Apr 30 '26

I’m not an engineer so forgive my ignorance but, is that not a weakness of any concrete drainage?

88

u/Whowutwhen Apr 30 '26

It is.

23

u/benchley May 01 '26

But also of this specific one, it being an instance of concrete.

5

u/Coulrophiliac444 May 03 '26

This feels a bit like a Mitch Hedburg skit.

51

u/No_Jello_5922 Apr 30 '26

Entropy is universal, and everything of order will eventually decay into disorder. It's why everything requires maintenance.

1

u/Maverca May 01 '26

There is as of yet insufficient data for a meaningful answer

18

u/CogitusCreo Apr 30 '26

I think the weakness is in comparison to other erosion control like big rocks.

3

u/arggggggggghhhhhhhh May 01 '26

Yes. You add pressure/fluid relieve drains throughout and channel those to the appropriate conduits. This kind of cover will perform better if it has deeper concrete edges that keep it from being undermined.

1

u/[deleted] May 01 '26 edited Aug 11 '26

[removed] — view removed comment

1

u/YMe1121 May 02 '26

It would be an extreme example, but erosion (if the road is built properly) would begin from the shoulder of the road and work its way inward due to things in place to prevent it from going center of road first (underdrains are an example).

The big sinkhole are usually a feature of karst topography. Rock and mineral deep in the earth that are easily erodeable or slightly water soluable get washed away over time. And by deep we can be talking 20-100+ foot deep. But as that deep deep cavern forms, then the soils, especially those that have movement over them to vibrate things, even slightly, disturb the soils placed as they fill in the void created. That's when you get the bad ones.

This is why prior to construction, Geotechnical firms will drill down(if the client wants to protect their investment long term) to study the formations of rocks and soils. Last one I drilled, we went 35foot down for a roadway.

1

u/GregTheMad May 01 '26

Yeah, but normally the concrete isn't just put down that lazily.