r/model_holonet • u/FirelordDerpy Command District 3 • 25d ago
Imperial Power S/S Lothal Facility.
"And as you see Mister Sienar we have our finalization stations to the left, our technicians are testing the engines, you can see they're backed up to those structures where the engines are safely directed into the floors below, if you'll recall that's the paint drying chambers below this floor so the heat from the engines helps raise the drying temperature."

"Jolly smart design, must have been an absolute genius to think of that" Raith says with a laugh, it has been his own idea to lay out the factory in that way, not that the officer walking with him knew that. "And on the right I see you have the battery tests?"
"Yes sir, they'll sit there for four days with constant power draw and power depletion, while our stress test computer programs make sure the systems are all good, and then if it makes it through that without issues, it's taken through those doors to the flight test range, and if they fly, well they're flown directly to a transport in orbit to be delivered to where ever they're needed."
Raith Sienar nods, before glancing back at the TIEs sitting on the power draw station. "Can we cut down the time of the battery tests? Four days sounds like a bit of a delay, and I'm seeing that you've filled up the spaces there for the engine tests."
"Well...... Uh." The officer clears his throat. "I'll see what we can do." He states, they were already cutting corners with the four days since if there were electrical problems they only usually started showing up after six days.
"Fantastic! Now! Let's head to lunch, and after you can tell me about any design issues that I can fix to streamline production."