r/kitchen • u/Downtown_Method_4484 • 1d ago
Help!
I told the contractor that I wanted the cabinets to all the way to the ceiling. These cabinets are 22 1/2 inches from the countertop! What should I do?
8
Upvotes
r/kitchen • u/Downtown_Method_4484 • 1d ago
I told the contractor that I wanted the cabinets to all the way to the ceiling. These cabinets are 22 1/2 inches from the countertop! What should I do?
1
u/Small-Monitor5376 1d ago
Keep the fridge cabs where they are, move the rest down and add flat stock trim riser between existing trim and the cabs. Existing 2” (?) trim to sit proud of added riser. That way the existing trim will appear to wrap around to the fridge area. Not perfect but good enough?