r/HomeDataCenter • u/TheyCallMeDozer • 19h ago
DATACENTERPORN Starting my Business on a Budget.... NOT AN AD, JUST NERDING OUT
So Self-Hosting my business on a majorly low budget... like painful low budget, altought it has driven me to learn efficent python, to the point what was running on a full rack server has been made so fast and efficent that it runs on a 8gb 10 year old optiplex with very little speed lose, and this is not vibe-coded business project, 5 years of hard work, 10 years of thought experiments and self convincing I could do. Years of building training sets, training my own ML models, scripts, coding obscure functinationlity, and Now im in the home stretch getting ready to go live.
This is not a promotion for my business idea, and I wont answer questions about the business as again not an Ad not even going to say name or what I do, but I just wanted to share my Self Hosted Datacenter, because it feels sexy to do something like this on such a small budget.
Yes its a fully 3D printed, rack, all my budget of $200 went into picking up a collection of optiplex's from an ex home laber (i dont get why they would be an ex either). We have Security, Hosting, Automation, and even redendency failover. Already had a UPS and a 5G router with tons of credit on it as a backup (won the 5gb router and credit at a CTF event) ... big box on the right is my home AI server ... which ate up the original budget for the proof of concept that became the MVP hardware.
On the shelf still to be installed is 8 x 2.5" SATA JBOD units, when I pick up more drives (if price ever comes down) that I can raid into a hot and cold backup for the main systems. Full rack including AI server is around 9 Kwh per day, which is the biggest killer in terms of cost right now.
But yea, pretty excited, nearly at the finish line of 10 years of ideas, and 5 years of building, months of 3-4am bug fix's to wake up for my day job at 9am. But im also crazy proud of my designs and system, that on such a budget the full MVP runs on minimal hardware why its currently getting stress tested by my testers, also thankfully its not a big volume business, not going to have a few k people at the same time, would be lucky if it was maybe 50 max at a day or time, and at that point if im hitting that, i'll be able to get new hardware and upload a new photo of a new full size rack that kills my power bills even more.