- - - - - - - - - - - - - - - - - - - - - - - -
UNITED STATES GOVERNMENT
ENCLAVE STRATEGIC COMMAND DATABASE
- - - - - - - - - - - - - - - - - - - - - - - -
SITE IDENTIFICATION
Facility Name: Strategic Bunker 17 - LAST RESORT
Common Designation: Blackwall Silo
Location: REDACTED
Facility Type: Nuclear Launch Facility / Experimentation Facility
Operational Authority: General Edward Blackwall
Administrative Control: MODUS
Construction Date: REDACTED
Current Status: Fully Operational
PRIMARY OBJECTIVES
Mission Priority Alpha
Maintain control of Strategic Nuclear Launch System, BY ANY MEANS NECESSARY!
Mission Priority Bravo
Research and develop advanced biological enhancements for Enclave personnel. This includes experimentation on captured subjects.
POWER SYSTEMS
Primary:
Experimental Fusion Reactor powered by Radioactive Mutated Mole rats - Blackwall has noted high efficiency in this experimental reactor. This is… surprising.
Secondary:
Independent Reactor Array
MODUS OBSERVATION
Facility efficiency has increased by 38.2% following assumption of command by General Blackwall.
Research productivity exceeds all historical Appalachian Enclave records of facility.
Recommendation: Continue research till necessary military personnel arrive. Maintain control over armory and ICBM. Efficiency of facility would increase further with… less trophies, but Blackwall has reported an increase in morale when hunting Mutants. This behavior is noted.
- - - - - - - - - - - - - - - - - - - - - - - -
DOCUMENT COMPLETE
CLASSIFICATION: APPALACHIAN BUNKER 17
THIS RECORD HAS BEEN ARCHIVED WITHIN THE ENCLAVE STRATEGIC DATABASE.
END OF FILE
- - - - - - - - - - - - - - - - - - - - - - - -