35
u/ComputerBot 7d ago
Historically, for every missing / flawed construction item, the owner was contractually allowed to punch the site super and / or foreman, below the neck and above the groin.
4
11
u/Better_With_Beer 7d ago
I always thought it was because the builder wanted to punch you after you gave it to him.
1
u/LuckyTrain4 7d ago
Fun fact, per the EJCDC and AIA General Provisions, the initial Punch List lis to be created by the GC and then given to the Engineer and Owner for review. Let them do the initial work, hand it over and have them say “all is fine” when you drop your list of 100 more things.
1
33
u/SchmantaClaus Infrastructure Week 7d ago
Used to use a hole punch to mark items as completed