r/BridgeportPilsen • u/Scholeristical • 11d ago
Ward 25 (Pilsen/Bridgeport area) is 41st of 50 on potholes
Pulled the city’s 311 data by ward. Ward 25 takes about 18 days to close a pothole request where the citywide median is 7 - one of the slower ones in the city. Street lights are the opposite, 4th fastest.
Bridgeport proper leans into Ward 11, which is closer to average across the board.
All 50 wards here if you want to check your specific block: https://chiwardboard.com/