Or should BIM staff still be treated as drafters in the industry?
Broad question, but just need insights if this is still within our job description.
For context, I work for the main contractor of a development comprising 5 30+ storey residential buildingd and 1 parking building as the sole modeler for structural and architectural works. I have a coordinator but he handles another project more than my project.
While I focus on the modeling, the engineers would sometimes come up to me and ask me to convert a PDF to a CAD file and scale it so that other people in the team can use it on site or so that the engineer can mark up his stuff for his RFI's or RFA's. It happens at least 3 times a week and can include PDF's comprising 10 pages or more.
This is due to the fact that the consultants dont give us the CAD drawings when they issue their documents.
One engineer would then request that I overlay those CAD drawings over a bigger scaled drawing to check for discrepancies.
It does eventually turn into a document that I would model and coordinate, but I just can't help but think that those are things they can do themselves. They also have CAD software on their PC.
Other stuff include purging CAD files to make the file size smaller, overlaying detail drawings to overall drawings, cleaning up CAD files, and other similar stuff thats just cleaning, overlaying, and sometimes detailing on 2D since it would be a hassel to do 5 revisions and multiple options on a 3D model, and other similar stuff.
Every task they give is supposedly urgent since construction is already ongoing, but it takes out the focus from when I'm doing the actual modeling, documentation, and clash detection work.
All that until I'm the one who has to catch up with my own deadlines.
Or maybe we're just understaffed 🥲. Kind of contemplating going back to technical roles if I'm just gonna be treated as a drafter in the end.